Risk Organization for ERP Projects
Journal Title: International Journal of Innovation Engineering and Science Research - Year 2018, Vol 2, Issue 1
Abstract
Software projects’ past goes back to four or more decades. We encounter the first software project risk management paper in 1991[1] and the study [2] reports that in 1995 US spent $250 billion to software projects and these projects had estimated $59 billion in cost overruns and another $81 billion had spent on canceled software projects.Although failures are tremendous, we have observed the project risks and critical success factors are given like shopping lists and so the remedies of risk factors. Very few studies exist for searching the relationships of these risk factors and the relationship between remedies and risk factors. We are trying to construct a simple model of risks and remedies borrowing concepts from systems and control theory.
Authors and Affiliations
Mehmet ERİŞ, Özalp VAYVAY
WIDEBAND MONOPOLE ANTENNA POR HF AND VHF
The objective of this thesis is centered in the synthesis of a method of design of broadband monopole antennas for the range of HF and VHF. The antenna must have a practical size to be installed in a mobile station (auto...
An Assessment of Commercial Real Estate Performance as an Investment Option in Nnewi, Anambra State, Nigeria
Nnewi in the past two decades has grown considerably not only in size and infrastructural development but also as a commercial town to reckon with in Anambra State South-East Nigeria. This work therefore tries to assess...
The Hydrological Functioning of the Watershed of Lake Laya- El Hammam, East of Tunisia
The hydrological rate of flow of the watershed of Lake Laya El Hammam depends on its morphometric and geological features as well as its precipitation.The watershed of Lake Laya El Hammam is part of the coastal watershed...
Ice nucleation bacteria- a challenge for agriculture
Ice nucleating bacteria can harm plants by stimulating the formation of ice in their tissues. On the other hand they contribute to cloud formation and rain precipitation on earth. It looks like they can play a role to lo...
Risk Organization for ERP Projects
Software projects’ past goes back to four or more decades. We encounter the first software project risk management paper in 1991[1] and the study [2] reports that in 1995 US spent $250 billion to software projects and th...