Safety Improvements in Old Generation Pick and Carry Hydra Cranes With Reasonable Cost Control

Abstract

The project aims at reducing the accidents involved in construction project site where ever mechanical means of material handling is a major work. The Old Generation hydra cranes which are mostly used in construction sites has few high probable risk index which is a major threat for construction workers and Engineers. These high probable risks were assessed and necessary recommendations were taken to make these old generation hydra as a reliable tool machinery material shifting. At the same time necessary incorporation on old generation hydra were made at a reliable cost control as all construction activities were compared with cost vs production. After making necessary implications on the Old Generation hydra crane, the Risk probable value is capered with the earlier index value. All probable hazards associated with material handling are discussed and necessary effective actions were taken on the Old generation hydra. As the hazards were negotiated with effective means, the risk probable value is also brought down to a considerable value. Simultaneously the accidents involved was also brought down and ensured a safer work environment.

Authors and Affiliations

S M Siva Kannan, Dr. M Murugan

Keywords

Related Articles

Performance Analysis of Sorting Algorithms with C#

Sorting technique is mostly used in computer sciences and it used as a scale of a system performance and efficiency through implementing different sorting algorithm’s. In this research paper we have focus on the perform...

A GIS based approach to study changes of water use pattern of Swarnarekha watershed of Gwalior and adjoining areas in Madhya Pradesh

In the present study the issue of temporal changes of surface water use pattern has been evaluated by identifying hydrological features and water use of a very important watershed of Swarnarekha River nurturing the majo...

Application to Mobilise Activities in an Social Organization

Nowadays a people are very socially active but they do not find time to do it by reaching out to the places in their busy schedule. In this paper we propose applications that mobilize the activities done in the social o...

Comparison of Effect of Hot Water Curing, Steam Curing & Normal Curing on Strength of M-20 Grade of Concrete

Curing of concrete is the operation of maintaining humidity & temperature of freshly placed concrete during some definite period following placing, casting or finishing to assure satisfactory hydration of cement. When w...

Industrial Conflict: Conflict Necessary For Creativity

In today’s business scenario organizations are facing a major issue in the form of Conflict which requires attention. Conflict can be functional or dysfunctional. Functional conflict is for improvement whereas Dysfuncti...

Download PDF file
  • EP ID EP24700
  • DOI -
  • Views 409
  • Downloads 13

How To Cite

S M Siva Kannan, Dr. M Murugan (2017). Safety Improvements in Old Generation Pick and Carry Hydra Cranes With Reasonable Cost Control. International Journal for Research in Applied Science and Engineering Technology (IJRASET), 5(6), -. https://europub.co.uk/articles/-A-24700