Abstract

This study evaluates the safety management system at Xuefu Gas Station in Xiangtan City of China through a combination of Preliminary Hazard Analysis (PHA) and Fault Tree Analysis (FTA). Initially, PHA was employed to identify potential hazards and assess the probability of associated accidents. This analysis led to the formulation of preventive measures aimed at mitigating identified risks. Subsequently, FTA was utilized to construct a logical framework for analyzing the various causes of system failures and their interdependencies. The analysis revealed deficiencies in the management system, equipment, ignition sources, and human factors. An approximate calculation method was applied to rank the structural importance of these factors, thereby highlighting key areas of impact. Based on these findings, targeted recommendations were proposed to enhance the safety management practices at the gas station, thereby reducing accident likelihood and safeguarding personnel and property. The results underscore the necessity of improving management practices, upgrading equipment, controlling ignition sources, and bolstering human factors to achieve a comprehensive safety management system.

Authors and Affiliations

Qi Li, Hai Wu, Baoquan Zhang, Zhihong Dong, Tao Ling

Keywords

Related Articles

Efficacy and Space Optimization in Industrial Warehouses: An Evaluation of Paternoster Continuous Vertical Conveyors

In the field of industrial buildings, notably within warehouse settings, the optimization of floor space emerges as a paramount concern. The deployment of equipment facilitating continuous transport is mandated to not on...

Integrated Scheduling of the Production and Maintenance of Parallel Machine Job-shop Considering Stochastic Machine Breakdowns

The integrated scheduling of production and maintenance can make equipment maintenance in line with the production pace, so as to effectively prevent anormal interruptions of the production process due to equipment failu...

Mitigating Construction Delays in Iran: An Empirical Evaluation of Building Information Modeling and Integrated Project Delivery

Project delays pose a substantial challenge in the construction sector. The primary objective of this research is to discern the root causes of project delays in the construction industry and proffer potential solutions,...

Geometrical Modeling of Extruder Screws Utilizing the Characteristic Product Features Method in CAD

Computer-Aided Design (CAD) is employed extensively to facilitate design processes through software tools, serving as an indispensable component in Reverse Engineering (RE) across various sectors. This study elucidates t...

Optimization of the Plasma Arc Cutting Process Through Technological Forecasting

This research employs a data-driven approach to optimize the plasma arc cutting process. The evaluation of cut quality is based on six output characteristics, while the input parameters include stand-off distance, cuttin...

Download PDF file
  • EP ID EP752319
  • DOI 10.56578/jemse030303
  • Views 17
  • Downloads 0

How To Cite

Qi Li, Hai Wu, Baoquan Zhang, Zhihong Dong, Tao Ling (2024). Safety System Study of Gas Stations Based on Preliminary Hazard Analysis and Fault Tree Analysis. Journal of Engineering Management and Systems Engineering, 3(3), -. https://europub.co.uk/articles/-A-752319