SCHEDULING CONSTRUCTION PROJECT WITH LIMITED AVAILABILITY OF SUBCONTRACTORS

Journal Title: Scientific Journal of the Military University of Land Forces - Year 2012, Vol 166, Issue 4

Abstract

Complex construction projects involve subcontracting some tasks, as the main contractor is not able to complete them due to resource unavailability, inadequate expertise, or for purely economic reasons. To coordinate operations on the building site, subcontractors availability has to be considered with respect to the project requirements and subcontractors' project portfolios. The paper presents a mathematical model of this problem and an example of its implementation in the selection of subcontractors.

Authors and Affiliations

Sławomir BIRUK

Keywords

Related Articles

PROBLEMY TRANSPORTU WOJSKOWEGO W OPERACJACH POZA GRANICAMI KRAJU

W pierwszej części artykułu przedstawiono analizę wymagań Sojuszu Północnoatlantyckiego w zakresie strategicznego przemieszczenia wojsk względem państw członkowskich. W drugiej na podstawie dogłębnej analizy procesu prze...

INFLUENCE OF MILITARY VEHICLES OPERATIONAL CONDITIONS ON CHANGE OF OPERATIONAL MATERIALS PROPERTIES

The quality of operational materials stored for a long time in military vehicle systems deteriorates under the influence of changeable weather conditions (ageing). This substantially results in decreasing the functional...

ZASTOSOWANIE SZTUCZNYCH SIECI NEURONOWYCH W SYSTEMACH WSPOMAGANIA DECYZJI Z OBSZARU ZARZĄDZANIA LOGISTYKĄ

W artykule przedstawiono możliwości wykorzystania komponentu TFannNetwork, opartego na bibliotece FANN wersja 2.0, do budowy aplikacji komputerowych wykorzystywanych w procesie zarządzania logistyką. Możliwości komponent...

STUDYING IMPACT OF DEFLECTOR SHAPE ON ACCELERATIONS FORCED BY EXPLOSION OF SMALL EXPLOSIVE CHARGE

This paper presents the results of experimental tests of accelerations caused by the detonation of low-power explosive charges. The field tests were performed on a specially-designed research station. With the right desi...

Download PDF file
  • EP ID EP61547
  • DOI -
  • Views 71
  • Downloads 0

How To Cite

Sławomir BIRUK (2012). SCHEDULING CONSTRUCTION PROJECT WITH LIMITED AVAILABILITY OF SUBCONTRACTORS. Scientific Journal of the Military University of Land Forces, 166(4), 96-103. https://europub.co.uk/articles/-A-61547