SCHEDULING CONSTRUCTION PROJECT WITH LIMITED AVAILABILITY OF SUBCONTRACTORS

Journal Title: Scientific Journal of the Military University of Land Forces - Year 2012, Vol 166, Issue 4

Abstract

Complex construction projects involve subcontracting some tasks, as the main contractor is not able to complete them due to resource unavailability, inadequate expertise, or for purely economic reasons. To coordinate operations on the building site, subcontractors availability has to be considered with respect to the project requirements and subcontractors' project portfolios. The paper presents a mathematical model of this problem and an example of its implementation in the selection of subcontractors.

Authors and Affiliations

Sławomir BIRUK

Keywords

Related Articles

Fault analysis of the combustion engine used in public transport vehicles

The goal of this article is the fault analysis of combustion engines on the basis of the assessment of dependent variables: initial mileage, annual mileage and the annual number of orders made in the service and repair s...

ROLE OF ENTREPRENEURSHIP IN MANAGEMENT

The article characterises the multidimensional and dynamic phenomenon referred to as the role of entrepreneurship and entrepreneurial management. It was shown that the development of entrepreneurship and innovation are c...

CRISIS MANAGEMENT AS AREA OF CROSS-BORDER CO-OPERATION

With greater and greater European integration, foreign and cross-border co-operation between local governments has been intensified and has embraced more and more areas of co-operation. Cross-border co-operation in the a...

SIŁA MILITARNA – CZYNNIK REKONSTRUOWANY W STOSUNKACH MIĘ-DZYNARODOWYCH

Kres dwubiegunowej konfrontacji oznaczał zmniejszenie zagrożenia militarnego. Od roku 1996 nastąpił jednak ponowny wzrost wydatków wojskowych – zinten-syfikowany po 11 września – co było efektem sformułowania strategii p...

WYBRANE METODY IDENTYFIKACJI CZYNNIKÓW RYZYKA NA TLE CYKLU ŻYCIA PROJEKTU I BUDOWLANEGO PROCESU INWESTYCYJNEGO

W artykule scharakteryzowano m.in. cykl życia projektu i budowlany proces inwestycyjny. Spośród obszarów wiedzy metodyk zarządzania projektami wyróżniono elementy procesu zarządzania ryzykiem w projektach, a w szczególno...

Download PDF file
  • EP ID EP61547
  • DOI -
  • Views 83
  • Downloads 0

How To Cite

Sławomir BIRUK (2012). SCHEDULING CONSTRUCTION PROJECT WITH LIMITED AVAILABILITY OF SUBCONTRACTORS. Scientific Journal of the Military University of Land Forces, 166(4), 96-103. https://europub.co.uk/articles/-A-61547