SELECTION OF COMPENSATION WIND FARM EQUIPMENT CONNECTED TO THE NETWORK 110 KV

Abstract

Wind energy in Poland began to develop in the early 90s of the twentieth century, but its dynamic growth can be observed in subsequent years. At the end of 2014, the total installed capacity in wind farms in Poland amounted to 3 800 MW and continues to grow. The construction and installation of wind farms with high power brings with it a number of problems related to the compensation of the 110 kV cable lines of considerable length and the right type of compensation equipment. The article describes issues related to regulation of reactive power in wind farms and an analysis of individual compensation equipment used in wind energy.

Authors and Affiliations

Paweł Pijarski, Michalina Gryniewicz-Jaworska

Keywords

Related Articles

MODELING AND ANALYSIS OF MAGNETIC FIELD FOR UNTYPICAL COORDINATE SYSTEMS

The paper presents solution of the Laplace equation for the oblate spheroid coordinate system and calculation of the magnetic field distribution inside the oblate spheroid placed in a uniform magnetic field. Modeled sphe...

EFFECT OF FLUID CLEANLINESS CLASS FOR THE PHENOMENON OF EROSION OF THE SERVOVALVE METERING EDGES

Authors decided to present a hydraulic fluids contamination issue and its influence on the reliable operation of the servo valves. Contaminations were classified relative to their sources, and its effects. Among wear pro...

THE ANALYSIS OF SENSORY PLATFORM FOR USE IN THE INTERNET OF THINGS

The main purpose of the work was to analyze sensory platform solutions for use on the Internet of Things. Emphasis was placed on the literature study on Sensor Platforms, Internet of Things, Bluetooth Low Energy Communic...

ELEKTROTECHNOLOGIE WSPOMAGAJĄCE PRZETWARZANIE MATERIAŁÓW DIELEKTRYCZNYCH POCHODZENIA ROŚLINNEGO

Opracowanie ma charakter przeglądowy. Zamieszono w nim charakterystykę dwóch elektrotechnologii opracowanych w Katedrze Inżynierii Komputerowej i Elektrycznej tj.: suszenia konwekcyjnego w obecności pola elektrycznego or...

KONCEPCJA BUDOWY INTELIGENTNEGO SYSTEMU KONTROLI I DIAGNOSTYKI OPERACYJNEJ STANU TECHNICZNEGO WYPOSAŻENIA

Zaproponowano koncepcję budowy systemu automatycznej kontroli i diagnostyki operacyjnej stanu podstawowego wyposażenia technicznego. System kontroli i diagnostyki powinien działać razem z automatycznym systemem sterowani...

Download PDF file
  • EP ID EP81438
  • DOI -
  • Views 112
  • Downloads 0

How To Cite

Paweł Pijarski, Michalina Gryniewicz-Jaworska (2016). SELECTION OF COMPENSATION WIND FARM EQUIPMENT CONNECTED TO THE NETWORK 110 KV. Informatyka Automatyka Pomiary w Gospodarce i Ochronie Środowiska, 6(1), 47-50. https://europub.co.uk/articles/-A-81438