Simulation of Project Completion Time with Burr XII Activity Distribution

Journal Title: Asian Research Journal of Mathematics - Year 2017, Vol 6, Issue 4

Abstract

Project Evaluation and Review Technique (PERT) in conjunction with Monte Carlo simulation is no doubt a useful and an acceptable tool for the analysis of project networks. However, a common challenge in practice is the inability to confidently select appropriate input distribution to represent activity durations owing to scarcity of project network data. A pilot survey of bore hole drilling projects in Benue state, Nigeria revealed that most activity duration data do not follow the Beta distribution and some other commonly used activity duration distributions. Hence, the Burr XII distribution is introduced as input activity duration distribution in the simulation of stochastic project network. Some desirable properties that qualify the use of Burr XII distribution are also presented. Results obtained using the Burr XII activity duration distribution shows advantage over the traditional PERT-Beta.

Authors and Affiliations

Enobong Francis Udoumoh, Daniel W. Ebong, Iberedem A. Iwok

Keywords

Related Articles

The Combined Effects of Electro-osomotic and Magnetohydrodynamic with Viscosity and Thermal Conductivity in Reactive Fluid Flow

The study of combined effects of electro-osmotic and magnetohydrodynamic when viscosity and thermal conductivity of the reactive fluid flow is assumed to vary exponentially with temperature is examined. The governing equ...

On the Convergence of Gauss-type Proximal Point Method for Smooth Generalized Equations

Let X and Y be Banach spaces and Ω be an open subset of X. Let f : X → Y be a Fr´echet differentiable function on Ω and F : X  2Y be a set valued mapping with closed graph. We deal with smooth generalized equations whic...

Experimental and Mathematical Model for the Antimalarial Activity of the Ethanolic Stem Extract of Azadirachta indica A. Juss in Swiss Mice Infected with Plasmodium berghei berghei NK65

In spite of the control measures, malaria remains one of most health challenges of our time and will remain a problem until the transmission agent seize to exist which is impossible. This paper presents a five-dimensiona...

A Markov Chain Model Approach to Study Academic Promotions in Ghanaian Universities

Promotions of academic staff in universities and analogous institutions remain crucial to the attainment of economic, environmental and societal objectives nationally and globally. Notwithstanding the benefits to institu...

Multi-level Multi-objective Quadratic Fractional Programming Problem with Fuzzy Parameters: A FGP Approach

The motivation behind this paper is to present multi-level multi-objective quadratic fractional programming (ML-MOQFP) problem with fuzzy parameters in the constraints. ML-MOQFP problem is an important class of non-linea...

Download PDF file
  • EP ID EP338405
  • DOI 10.9734/ARJOM/2017/35707
  • Views 74
  • Downloads 0

How To Cite

Enobong Francis Udoumoh, Daniel W. Ebong, Iberedem A. Iwok (2017). Simulation of Project Completion Time with Burr XII Activity Distribution. Asian Research Journal of Mathematics, 6(4), 1-14. https://europub.co.uk/articles/-A-338405