slugImplementing Construction Projects on Schedule – A Real Challenge

Journal Title: International Journal of Management, IT and Engineering - Year 2011, Vol 1, Issue 7

Abstract

Engineers all over the world have been trying to find workable solutions to keep Engineering Construction project time over-run under good control. The activity networking technique initiated in the USA in the late fifties gained large popularity. This was followed by the introduction of the computer and a large number of management software aiming at effective project control. The techniques are in use globally including in the developing world. Needless to say these techniques have proved very useful, but the real problem of effectively controlling the slippage on construction projects, particularly in the developing countries like India, still remains largely unsolved. The author has done substantial work in India and other developing countries trying to find workable solutions to this burning issue and have achieved considerable success. Keeping in view this experience, the author has been actively pursuing further studies, research and detailed work in this area and his broad findings are outlined in this paper.

Authors and Affiliations

Prof (Dr. ) Debabrata Kar

Keywords

Related Articles

slugHybrid Rough Genetic algorithm for Selecting Optimal Routes

Routing protocols in most networks use the length of paths or the minimum-hops that can be achieved, as the routing metric. This led to the motivation to propose a new algorithm that satisfies multiple constraints for...

Various Routing Protocols Performance Analysis for WiMAX Network

Worldwide Interoperability for Microwave Access (WiMAX) is a useful technology provides fixed and mobile access and offer the same subscriber experience for fixed and mobile user. WiMAX Provides other significant facil...

slugAccession of Cyber crimes against Our Safety Measures

Cyber Crimes, or crimes perpetrated using digital technology and infrastructure, are rapidly growing problem. Yet digital evidence can be tied to more conventional crimes, so helping both police administrations, corpor...

slugReliability Prediction of FaultTolerant Multicomputer Interconnection Networks

This paper proposes a new method to identify all the maximal incomplete sub cubes present in a faulty cube taking maximum fault tolerance level i.e. number of faulty nodes is equal to the system dimension. The procedur...

slugIndustrial Relation Practices: An Empirical Analysis of Engineering Industry in Gujarat

One of the important aspects of Human Resource Management is industrial relations. It refers to be one of the most important in management era. Engineering industry is of prime importance for economic development of an...

Download PDF file
  • EP ID EP18113
  • DOI -
  • Views 335
  • Downloads 10

How To Cite

Prof (Dr. ) Debabrata Kar (2011). slugImplementing Construction Projects on Schedule – A Real Challenge. International Journal of Management, IT and Engineering, 1(7), -. https://europub.co.uk/articles/-A-18113