slugPRODIGIOUS PROCUREMENT MANAGEMENT ON ROBBINGTON GROUPS CONSTRUCTION PROJECT IN ENGLAND

Journal Title: International Journal of Management, IT and Engineering - Year 2012, Vol 2, Issue 5

Abstract

Robbington leisure place is a dynamic leisure group that is constantly seeking to expand its business forward. They are one of the largest operators of horseracing; they stage 20 percent of all racing fixtures held each year. Robbington is proposing to make significant improvements to their flagship racecourse at Hamchester to meet the St Dredger Stake scheduled for mid - September 2010. The improvement includes construction of grandstand, an exhibition centre, and construction of a new hotel facility and casino. This paper deals with a critical analysis and evaluation of this proposed Robbington Racecourse project from design to construction. The report started with the strategy briefing of Robbington’s Trust, to the stakeholder management and appraisal of procurement system so as to select the best route that will deliver the project at the stipulated time. Series of procurement method were carefully considered, ranging from Traditional method to Management Contracting. Traditional method would have been suitable for either phase of the project. But because the detailed design must be completed before construction work commences on site which may cause a longer project completion and time is paramount in the project but Design and Build method will allow early commencement of construction work on phase one due to the overlapping of design and construction work which makes the whole project time reduced. Management contracting method will also allow early commencement of work at the phase two and due to the highly innovative hotel facility and some level of complexity, which will be managed by the skilled management team. After careful consideration and assessment of Robbington’s objectives and suggestion from two (2) procurement path decision chart after (Bennett and Grice) and (Skitmore and Marsden) for phase one and phase two, the Design and Build method was adjudged the best procurement option for phase one and Management Contracting method for phase two.

Authors and Affiliations

S. Binil Sundar

Keywords

Related Articles

A study on Stress and Job Performance among School Teachers of Karimnagar City

This is an effort to check the performance, and also the self interest in work setting of school teachers within the karimnagar town. The teacher job is generally connected with psychological feature work and had to de...

A STUDY OF THE TOP PUBLIC SECTOR BANKS IN INDIA: A COMPARATIVE ANALYSIS OF THE FINANCIAL PERFORMANCE OF STATE BANK OF INDIA AND PUNJAB NATIONAL BANK

Indian Banking system had played an important role in the economic growth of India. RBI is the main authority of public sector banks, private banks, financial and non-financial institutions. Banking system is classifie...

THE ROLES AND RESPON SIBILITIES OF A HUMAN RESOURCE MANAGER IN AN ORGANISATION

This paper reveals about the roles and responsibilities of an HR who plays a vital role for smooth functioning of the Organization. It throws light on the conventional functions and the traditional role of HR managers....

Psychographic Segmentation of E-Retailing Consumers for Electronics Goods in Kolkata

Consumers, especially e-retailing consumers are too diverse in their psychological behavior. This paper provides a framework to identify Psychographic Segment of e-retailing consumers for Electronics Goods in Kolkata....

Network Simulation Based Parametric Analysis of AODV Protocol for Wireless Mobile Ad-hoc Network

A major aspect of ad-hoc networks is that the nodes can move randomly, which requires the routing protocols. The routing protocol should try to minimize control traffic, such as periodic update messages. Instead the ro...

Download PDF file
  • EP ID EP18300
  • DOI -
  • Views 311
  • Downloads 10

How To Cite

S. Binil Sundar (2012). slugPRODIGIOUS PROCUREMENT MANAGEMENT ON ROBBINGTON GROUPS CONSTRUCTION PROJECT IN ENGLAND. International Journal of Management, IT and Engineering, 2(5), -. https://europub.co.uk/articles/-A-18300