Solving Fully Fuzzy Critical Path Analysis in Project Networks Using Linear Programming Problems

Journal Title: Scholars Journal of Physics, Mathematics and Statistics - Year 2015, Vol 2, Issue 2

Abstract

A new method for finding fuzzy optimal solution, the maximum total completion fuzzy time and fuzzy critical path for the given fully fuzzy critical path (FFCP) problems using crisp linear programming (LP) problem is proposed. In this proposed method, all the parameters are represented by triangular fuzzy number. The fuzzy optimal solution of the FFCP problems obtained by the proposed method, do not contain any negative part of the values of the fuzzy decision variables. This paper will present with great clarity of the proposed method and illustrate its application to FFCP problems occurring in real life situations.

Authors and Affiliations

M. Jayalakshmi

Keywords

Related Articles

Application of Halanay Inequality to the Stability of the Disease Free Equilibrium of a Delayed Malaria Transmission Model

By the applications of Halanay type inequality and the theory of nonsingular M-matrix, the global asymptotical stability of the disease free equilibrium of a delayed malaria transmission model is obtained when the basic...

The exact solutions to the generalized Ginzburg-Landau equation with high-order nonlinear term

We study the exact solutions to the generalized Ginzburg-Landau equation with high-order nonlinear term in this paper, After the travelling wave transformation, the equation is reduced to an integrable ordinary different...

Effects of Radiation and Chemical Reaction on MHD Flow Past Over Vertical Plate with Variable Temperature and Mass Diffusion

In the present paper, we study the effects of radiation and chemical reaction on flow past an oscillating vertical plate with variable wall temperature and mass diffusion in the presence of transversely applied uniform m...

Measurement of Radon Exhalation Rates from Soil Samples of Some Villages of Ambala, Haryana

The world is naturally radioactive as some of the materials in the nature are radioactive. Uranium is one of them and can be found in trace amount in most rocks and soils. Uranium decays to radium that leads to the decay...

Common Fixed Point Results for Weakly Compatible Map in Digital Metric Spaces

This paper aims at proving fixed point results for weakly compatible maps in the setting of digital metric spaces. Also, an application and conclusion is cited in the end of this note.

Download PDF file
  • EP ID EP384448
  • DOI -
  • Views 102
  • Downloads 0

How To Cite

M. Jayalakshmi (2015). Solving Fully Fuzzy Critical Path Analysis in Project Networks Using Linear Programming Problems. Scholars Journal of Physics, Mathematics and Statistics, 2(2), 144-150. https://europub.co.uk/articles/-A-384448