Strategic Multi-Factor Root Cause Analysis for Lead Time Optimization in Jewellery Manufacturing

Journal Title: International Journal of Current Science Research and Review - Year 2025, Vol 8, Issue 05

Abstract

One of the strengths that company need to have been the ability to release new models faster than competitors. It will give the opportunity for the company to capture the market share. However, company need to have a quick mass producing for the new models after prototype released to the market. Slow mass producing will open the window for the competitor to imitate the prototype and give the chance for them to capture all the markets if they have quicker mass-producing time. This issue happens in jewellery companies in Indonesia, one of the companies is XYZ Company. Prototype models from XYZ company are widely imitated by competitors who have faster production time. To overcome this issue, company need to analyse the root cause of slow mass production process in the company. Based on this analysis, recommendations can be given to the company and applied to accelerate the production process so the company will not lose the market anymore. The root cause analysis was conducted by using a fishbone diagram with a case study in XYZ company. Through the analysis, it can be seen that the root cause of the slow production time is due to lack of human resources thar involved in production. Based on this finding, series of measures such as hiring additional employees and implementing the overtime hours for the employee can be applied to speed up the production time and even increase the capacity.

Authors and Affiliations

Theresa Putri Theofilus

Keywords

Related Articles

Increasing the Adoption of Performance Management Application at PT. Kaltim Prima Coal

Traditional performance management systems often suffer from bureaucracy and inefficiency in providing timely feedback and support (Awan et al., 2020). To address these issues, KPC implemented Entomo, a performance manag...

A 3 Year Review of Spine Surgeries in a New Neurosurgery Centre in an Urban Specialist Health Facility in Southeast Nigeria

Background: The Imo State Specialist Hospital (IMSSH) commenced neurosurgical services in April 2021 and spine procedures in August 2021. This is an audit of spine pathologies surgically managed in the hospital in her fi...

Strategies to Improve the Sales Performance of Car Loan Products in Bank Shinhan Indonesia

In internal Bank Shinhan, My Car Loan is one of their top consumer products. However, when compared to other car financing competitors, Bank Shinhan was far behind in terms of sales performance. Hyundai Motors Indonesi...

From Routes to Resilience: Exploring Manila Jeepney Drivers' Demographics and Perspectives on Proposed Public Utility Vehicle Modernization Program (PUVMP) through Thematic Analysis

The Department of Transportation (DoTr) introduced the Public Utility Vehicle Modernization Program (PUVMP) through Department Order No. 2017-011 as the Philippines pushed towards modernization. The program aims to impro...

Factors Influencing Patient Delay in Pulmonary Tuberculosis in a Community Setting: A Cross-Sectional Study

Delays in the treatment of Tuberculosis (TB) result in the failure to achieve the TB program’s goals. The delay in TB treatment can be measured by patient delay and healthcare service delay.This study aims to analyze the...

Download PDF file
  • EP ID EP766087
  • DOI 10.47191/ijcsrr/V8-i5-17
  • Views 12
  • Downloads 0

How To Cite

Theresa Putri Theofilus (2025). Strategic Multi-Factor Root Cause Analysis for Lead Time Optimization in Jewellery Manufacturing. International Journal of Current Science Research and Review, 8(05), -. https://europub.co.uk/articles/-A-766087