Study on Flow Plasticity and Permeability of Mixture Conditioned Muck for Metro Shield Tunnel in Water-rich Sand Stratum
Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 3
Abstract
[Objective] When tunnel boring machine advancing in the water-rich sand layer, problems such as high cutter torque, serious wear and spout of the screw conveyer can be easily generated. In order to ensure the safety of construction, it is necessary to improve the muck. [Method] Based on a shield tunnel section project of Xi’an Metro Line 16, the muck modifier is selected according to the characteristics of poor self-stability, high friction and high permeability of sandy soil stratum. By combining slump test, permeability test and on-site test, two schemes of foam alone conditioning and mixed foam-bentonite slurry conditioning are used to carry out the experimental research on muck conditioning in water-rich sand layer. [Result & Conclusion] In the actual shield tunneling construction, on the premise of safety, efficiency and economy and based on the data obtained in laboratory tests, the conditioning scheme of mixed foam-bentonite slurry is adopted. The performance of the modifier meets the requirements of shield tunneling construction when the ratio of bentonite to water is 1/8 and the foam mass fraction is 3%. The muck conditioning by foam alone is greatly affected by water content. The higher the water content is, the smaller the optimal foam injection rate (FIR) becomes. The best muck conditioning option for medium sand is 10% of the bentonite slurry injection ratio (BIR) and 20%~25% of FIR. The best muck conditioning option for gravel sand is 10% of BIR and 35%~40% of FIR. Engineering practice shows that the muck conditioning has good effect and the parameters of shield tunneling are stable.
Authors and Affiliations
Xuanrong ZHENG, Ying LIU, Pengcheng DING, Peng LI, Feng GUO, Hongchao LU, Junfeng LI
Reflection from Zhengzhou ′7·20′ Rainstorm towards Personnel Evacuation Platform Renovation Design in Metro Sections
Objective In recent years, extreme weather events and natural disasters increase and intensify frequently, and rainstorm-induced disasters in built urban rail transit and on-going foundation pit projects are causing sign...
Degraded Operation Train Positioning and Protection Scheme Based on Beacons
Objective When the on-board signaling equipment fails, relying on trackside secondary positioning equipment for degraded operational train positioning and protection requires additional trackside signaling equipment, inc...
Structural Design of City Railway Underground Depot with Reserved Conditions for Overlying Property Development
[Objective] To further improve land use efficiency, reduce the fragmentation of urban space, enhance the regional urban image, and avoid the impact of regional transportation three-dimensional development and pedestria...
Visual Positioning Detection of EMU Brake Pad Based on Deep Learning
[Objective] With the continuous development of the rail transit industry, its operation scale and safety requirements are constantly increasing. To address the issues of low efficiency, missed and false detections in t...
Span-height Aspect Ratio of Pre-stressed Reinforced Concrete Track Beams for Straddle Monorail with 1 250 mm Gauge and 25 m Span
[Objective] To adapt to the building characteristics of a new-model straddle monorail train, mechanical performance analysis and interface optimization research are conducted on a new type of PRCTB (pre-stressed reinforc...