STUDY ON TIME AND COST MANAGEMENT IN CONSTRUCTION

Journal Title: International Journal of Civil Engineering and Technology - Year 2019, Vol 10, Issue 3

Abstract

In India large construction projects are inherently complex and dynamic. Many projects start with good ideas, huge investments and great efforts. However, most of them do not achieve much success. A major contribution to unsuccessful projects is the lack of understanding on scope, time, cost and quality. This project Projects as powerful strategic weapons when initiated create economic value and competitive advantage. The objective of the research is to explicitly declare the scope of the research to by considering only the scope, time, cost and quality as process success parameters and how specifically the cost element would influence the project success when all other elements or factors other than cost are represented in terms of cost factor along with the contract conditions as basic rules or constraints that drive the strategic cost based on applying the analysis methodology concept. The concept of benchmarking would provide right meaning of project success when allowing to properly distributing the meaning of customer profitability to the project providers (project owner and contractors). In this discussion, we emphasize the project management uses of accounting information. Interpretation of project accounts is generally not straightforward until a project is completed, and then it is too late to influence project management.

Authors and Affiliations

K. VENKAT RAMAN, P. DAYAKAR, R. VENKATKRISHNIAH and. A. MANI

Keywords

Related Articles

ON-STREET PARKING PROBLEMS IN CBD AREA & REMEDIEL MEASURES-A CASE STUDY OF GODHRA CITY

The unprecedented growth of vehicles has increased parking space demand into cities. It has a considerable effect on transportation development in the city. The availability of less space in urban areas has rising dema...

A COMPARATIVE STUDY OF STATIC ANALYSIS (AS PER IS: 1893-2002) & DYNAMIC ANALYSIS (AS PER IS:1893-2016) OF A BUILDING FOR ZONE V

In present study, different storied building has been modeled using staad.pro software and analyzed with gravity and seismic loads to compare the results of seismic analysis as per IS:1893-2002 and IS:1893-2016.The des...

SENSITIVITY ANALYSIS AND SLOPE STABILITY RISK OF KALIWADAS LIMESTONE HILLS AT KARANGSAMBUNG REGIONS, KEBUMEN, CENTRAL JAVA

On the limestone hills, Kaliwadas hill in Karangsambung, Kebumen, Central Java, occurs a crack that have gone on a landslide which have an impact on infrastructure losses. Post-landslide weather conditions that occur a...

A SMART CAMPUS OVERVIEW OF ISLAMIC PERSPECTIVES IN UNIVERSITI KEBANGSAAN MALAYSIA

UKM needs to position itself to embrace the Transformation 2050 (TN50) plan and the emergence of the Fourth Industrial Revolution (4IR). This ‘Resilient Community in Smart and Sustainable Campus’ project which is 1 out...

VULNERABILITY OF SAISS GROUNDWATER RESOURCES FOR RENEWABLE DRINKING WATER PRODUCTION MOROCCO

The problem of water pollution affects the whole world including groundwater which is more susceptible to contamination by residues of industry, agriculture and domestic wastewater leading to the emergence of many seri...

Download PDF file
  • EP ID EP46394
  • DOI -
  • Views 175
  • Downloads 0

How To Cite

K. VENKAT RAMAN, P. DAYAKAR, R. VENKATKRISHNIAH and. A. MANI (2019). STUDY ON TIME AND COST MANAGEMENT IN CONSTRUCTION. International Journal of Civil Engineering and Technology, 10(3), -. https://europub.co.uk/articles/-A-46394