Substantiation of the Replacement Interval of Construction Machines by the Target Reliability Level

Journal Title: Architecture and Engineering - Year 2017, Vol 2, Issue 1

Abstract

The article presents results of researches in the field of ensuring operational capability of complex technical objects using the example of construction machines. Methods of determining the replacement interval of elements in accordance with the accepted at the present time progressive operating strategy — by technical condition, in accordance with the current reliability level, determined by statistical or parametric characteristics of replaced units — are considered. Replacement is performed before reaching of limiting values of characteristics. Parametric characteristics are measured in the process of unit condition diagnostics, and statistical characteristics are determined on the basis of operational information.

Authors and Affiliations

Sergey Repin, Andrej Zazykin, Natalya Krotova

Keywords

Related Articles

ESTIMATION OF TRANSPORTATION ENERGY EFFICIENCY BY BARTINI CRITERION L6T-4

The review of performance and energy effectiveness of transportations reveals the lack of the squared delivery speed in their structure. The need to attract the squared speed as the major factor in forming the assessment...

CHANGE IN WOOD STRENGTH UNDER STATIC BENDING AND COMPRESSION ALONG FIBERS IN THE PROCESS OF TREE GROWTH

According to the basic principles of bionics, internal forces are formed in the tree trunk during its growth; these forces generate the strength and resistance of the tree to influence of wind loads and its own weight. W...

THE MATHEMATICAL MODEL OF DOME COVERING INDUSTRIAL FACILITY

A statically determinate flat truss models the industrial facility's arch. To derive dependence of structural deflection on the number of panels in a span, the Maxwell–Mohr equation, computer mathematics system Maple and...

AIRPORT ENVIRONS — TASKS OF THE INTEGRATED DEVELOPMENT (USING THE EXAMPLE OF THE PULKOVO AIRPORT)

This article touches upon the relevant issue connected with a world-wide tendency to the development of territories around airports. Development directions of the Pulkovo Airport and its adjacent territories in Saint Pet...

FORECASTING OF ECOLOGICAL SITUATION IN COURSE OF BUILDINGS’ DESIGN

Design of buildings requires the all-round forecast aimed at the provision of ecologically safe environment in buildings while minimizing power consumption. To increase the efficiency of design solutions and indoor air q...

Download PDF file
  • EP ID EP352979
  • DOI 10.23968/2500-0055-2017-2-1-51-60
  • Views 99
  • Downloads 0

How To Cite

Sergey Repin, Andrej Zazykin, Natalya Krotova (2017). Substantiation of the Replacement Interval of Construction Machines by the Target Reliability Level. Architecture and Engineering, 2(1), 51-60. https://europub.co.uk/articles/-A-352979