TECHNIQUES OF GENERATING SCHEDULES FOR THE PROBLEM OF FINANCIAL OPTIMIZATION OF MULTI-STAGE PROJECT

Journal Title: Applied Computer Science - Year 2019, Vol 15, Issue 1

Abstract

The article presents the problem of scheduling a resource-constrained project with discounted cash flow maximization from the perspective of a contractor. The contractor's expenses (cash outflows for the contractor) are associated with the execution of activities. The client's payments (cash inflows for the contractor) are performed after fulfilling the agreed project stages. The following techniques are suggested for solving the problem: the activity right-shift procedure, the backward scheduling with the opti-mization of completion dates for the agreed project stages and the modified triple justification technique. The effect of these techniques of generating schedules is illustrated for an exemplary project. Finally, an experimental analysis of the proposed procedures is presented.

Authors and Affiliations

Marcin Klimek

Keywords

Related Articles

APPLICATION OF DATA MINING TECHNIQUES TO FIND RELATIONSHIPS BETWEEN THE DISHES OFFERED BY A RESTAURANT FOR THE ELABORATION OF COMBOS BASED ON THE PREFERENCES OF THE DINERS

Currently, blended food has been a common menu item in fast food restau-rants. The sales of the fast-food industry grow thanks to several sales strate-gies, including the “combos”, so, specialty, regional, family and buf...

THE USE OF SIMULATION ENVIRONMENT FOR SOLVING THE ASSEMBLY LINE BALANCING PROBLEM

The paper describes the application of a simulation environment (Tecnomatix Plant Simulation) for solving a real manufacturing problem. The studied case consisted in rebalancing the production line with a specified numbe...

THE INFLUENCE OF THE INJECTION TIMING ON THE PERFORMANCE OF TWO-STROKE OPPOSED-PISTON DIESEL ENGINE

The performance of the engine strongly depends on the parameters of the combustion process. In compression ignition engines, the fuel injection timing has a significant influence on this process. The moment of its occurr...

ENCAPSULATION OF IMAGE METADATA FOR EASE OF RETRIEVAL AND MOBILITY

Increasing proliferation of images due to multimedia capabilities of hand-held devices has resulted in loss of source information resulting from inherent mobility. These images are cumbersome to search out once stored aw...

IDENTIFICATION OF A BACKLASH ZONE IN AN ELECTROMECHANICAL SYSTEM CONTAINING CHANGES OF A MASS INERTIA MOMENT BASED ON A WAVELET–NEURAL METHOD

In this article a new method of identification of a backlash zone width in a structure of an electromechanical system has been presented. The results of many simulations in a tested model of a complex electromechanical s...

Download PDF file
  • EP ID EP557050
  • DOI 10.23743/acs-2019-02
  • Views 61
  • Downloads 0

How To Cite

Marcin Klimek (2019). TECHNIQUES OF GENERATING SCHEDULES FOR THE PROBLEM OF FINANCIAL OPTIMIZATION OF MULTI-STAGE PROJECT. Applied Computer Science, 15(1), 18-35. https://europub.co.uk/articles/-A-557050