The Challenges of Implementing Building Information Modeling in Indonesia Construction Projects

Journal Title: Engineering and Technology Journal - Year 2024, Vol 9, Issue 04

Abstract

The future of BIM is exciting and full of challenges, but there are several obstacles to implementing BIM effectively in the construction sector in Indonesia. Thus, the aim of this research is to examine the challenges of implementing BIM on construction projects, especially in Indonesia. Data was obtained from 45 respondents who answered questionnaire questions, including owners, consultants, contractors/subcontractors, private companies and state-owned enterprises representing construction parties in Indonesia. Empirical analysis using the Correlation Coefficient-A Measure of Linier method states that there are seven variables which are challenging variables in implementing BIM in construction projects. The seven challenge variables are BIM technical readiness, organizational paradigm changes regarding BIM, work environment awareness of BIM, compliance on BIM rules, increased competency and skills, consistent application of effective leadership, maturity of BIM utilization. These seven challenge variables have a linear relationship with the application of BIM in Indonesian construction projects. In conclusion, construction project parties in Indonesia must responses positively to these seven challenges to ensure that the implementation of BIM in construction projects in Indonesia is in accordance with the regulations released by the government.

Authors and Affiliations

Josefine Ernestine Latupeirissa, Hermin Arrang, Irwan Lie Keng Wong,

Keywords

Related Articles

Design and Application of Duct Leak Detection Instrument in the Aircraft Pneumatic Systems

The pneumatic manifold system pipes on airplanes contain air with a pressure of approximately 45 psi and a temperature of approximately 117oC. This pipe stretches from the tip of the right wing to the tip of the left and...

RHEOLOGICAL STUDY ON STRENGTH CHARACTERISTICS OF SANDCRETE HOLLOW BLOCK ADMIXED WITH OIL PALM STEM ASH

The study investigated the use of oil palm stem ash as partial replacement of OPC for sandcrete hollow block production which ranges from 0 to 25% (at 5% interval). Ninety six (96) sandcrete blocks were cast using 1:6 as...

Drying Performance of Integrating Mesh Wire as Drying Space into the Inflatable Solar Dryer for Drying Coffee

The drying performance of coffee laid in a mesh wire that serves as a drying space in an inflatable solar dryer (ISD) was evaluated and compared to open sun drying (OSD) and ISD without mesh wire drying space in the Phil...

Neighbourhood Component Regression Approach for Housing Unit Price Prediction

Predicting housing unit price (HUP) is important for potential buyers and investors to make informed decisions. This study proposes a novel HUP prediction model based on neighbourhood component regression (NCR). The prop...

Turbo Traverse Dispatch Delivery Assistant Cannibalizing Routing Algorithm

This project aims to develop an innovative delivery bot system that leverages GPS navigation, a digital display, and OTP authentication to transform the delivery process. The system integrates advanced route planning alg...

Download PDF file
  • EP ID EP734659
  • DOI 10.47191/etj/v9i04.28
  • Views 62
  • Downloads 0

How To Cite

Josefine Ernestine Latupeirissa, Hermin Arrang, Irwan Lie Keng Wong, (2024). The Challenges of Implementing Building Information Modeling in Indonesia Construction Projects. Engineering and Technology Journal, 9(04), -. https://europub.co.uk/articles/-A-734659