The heating of residential and commercial premises in urban areas during winter periods is mostly performed by use of the heat energy which is distributed through central or city heating systems. Water, steam and gas are used as the basic working media in these heating systems. The thermal energy that is used in the city of Kakanj and its surrounding settlements is produced in the Thermal Power Plant Kakanj and then delivered to the final consumers, which are usually located at relatively large distances from the heat source. This paper describes the district heating system in Kakanj and the process of heat energy distribution carried out by JP „Grijanje“ d.o.o. Kakanj.

Authors and Affiliations

Nedim Hodžić, Almir Kahriman, Elma Ekinović

Keywords

Related Articles

Academic Staff Evaluation – Objective Model

Academic staff evaluation poses a unique challenge in higher education system in Bosnia and Herzegovina. The established practice of selfrepresenting the absolute authority in public higher education institutions attenua...

Modernization and Automation of Automotive Industry Production Processes with Industrial Robots

The paper aims to answer if the industrial robot is a motif of accelerated trend of automation and modernisation of production processes in automotive industry in the world. It describes the application of industrial rob...

SOPHIA – BIESSE´s Step Towards Industry 4.0

The permanent theme at the machine trade fairs is Industry 4.0, and it is apparent that dramatic changes are taking place in the industry. Industry 4.0 will be a milestone when it comes to increasing production and effic...

Analysis of Water Evaporation in Twin Screw Compressors Using CFD

Twin screw compressors are extensively used in applications which require pressures higher then allowable pressure in oil free compressors but would benefit from oil free operation such as food processing, pharmaceutical...

Analysis Solution of Cut Using Methods of Reinforced Wall, Soil Nailing and Making Retaining Wall

The paper describes analyses solution of cut in the highway. There have been used three methods of making construction: reinforced wall with HDPE geogrids, soil nailing and retaining wall 20 meters long. AASHTO standards...