THE EFFECT OF BRICKLAYER’S WORK METHOD ON TILE INSTALLATION WORKING TIME

Abstract

The implementation of a construction project consists of several works that carried out by labourer or craftsman in accordance to their specifications of expertise. To achieve both time and quality target of work output, each craftsman use different work method that consists of a series of activities. From a series of activities that carried out by each craftsman, the time needed to complete a work can be calculated. This study observed the activities of bricklayers in tile installation. The method that used in the study of bricklayers in tile installation is a literature study. On the other hand, an on-site study is performed by recording a number of bricklayers in tile installation. The recordings of each bricklayer were studied so that a series of activities and the activity time of tile installation can be obtained. From the observations of 35 bricklayers regarding work method and activity time of the tile installation, 4 (four) work methods were identified. Of all the samples that have been studied, the fastest is the bricklayer number 9 (nine) whose activity time was 7.69 minutes by using the work method number 2 (two).

Authors and Affiliations

Keywords

Related Articles

USE OF PLANT BIOCIDAL SUBSTANCES BASED ON CRATAEVA RELIGIOSA AGAINST TUTA ABSOLUTA (LEPIDOPTERA: GELICHIIDAE) DEVASTATOR OF TOMATO CROPS

The tomato leaf miner, Tutaabsoluta causes serious losses in production. It can feed on all the green parts of the tomato and can cause up to 100% damage if not controlled. Presently, the most effective method of pest co...

EXPERIMENTAL STUDY AND ANALYSIS OF WEAR IN SHEET METAL DURING VARIOUS FORCES

Sheet metals are metal formed by an industrial process into thin, flat pieces. It is one of the fundamental forms used in metal working and it can be cut and bent into a variety of shapes. Countless everyday objects are...

A REVIEW STUDY ON BIG DATA ANALYSIS USING R STUDIO

Big Data Analytics is a way of extracting value from these huge volumes of information, and it drives new market opportunities and maximizes customer retention. The rapid rise of the Internet and the digital economy has...

COMPARISON BETWEEN LASER ADDITIVE MANUFACTURING AND LASER SPOT WELDING OF TITANIUM GRADE 2

The microstructure and hardness of the melted area in a titanium grade 2 sample processed by Laser Spot Welding were compared to those processed by Selective Laser Melting. The results show that the materials obtained wi...

ABOUT A CORRECT INTERPRETATION OF THE CONNECTION BETWEEN CLASSICAL ELECTRODYNAMICS AND THE SPECIAL RELATIVITY

The purpose of this article is to bring the basic ideas of O. D. Jefimenko to the physical and mathematical community about the physical explanation of some theoretical conclusions of the Special Theory of Relativity. In...

Download PDF file
  • EP ID EP572124
  • DOI 10.5281/zenodo.3232880
  • Views 107
  • Downloads 0

How To Cite

(2019). THE EFFECT OF BRICKLAYER’S WORK METHOD ON TILE INSTALLATION WORKING TIME. INTERNATIONAL JOURNAL OF ENGINEERING TECHNOLOGIES AND MANAGEMENT RESEARCH, 6(5), 117-126. https://europub.co.uk/articles/-A-572124