THE EFFECTIVENESS OF ORGANIC POLLUTANTS REMOVAL IN CONSTRUCTED WETLAND WITH HORIZONTAL SUB-SURFACE FLOW
Journal Title: Civil and Environmental Engineering Reports - Year 2015, Vol 1, Issue 16
Abstract
This paper presents the results of the research work related to the removal efficiency from wastewater organic pollutants and suspended solids at HSSF (horizontal subsurface flow) construcred wetland. The average effectiveness defined as loss of value COD in wastewater has reached 77%, for BOD5 - 80% and TOC - 82%. The effect of seasonal temperature changes and the period of plant vegetation and rest on the effectiveness of wastewater treatment were also analyzed. The results of the presented research showed a decrease in the efficiency of removing organic pollutants from wastewater and suspended solids in the autumn and winter. During the vegetation the object in Małyszyn has been characterized by the effectiveness of wastewater treatment at the level of 78% for COD, 82% for BOD5, and in the non-vegetation period the effectiveness has decreased up to 75% for COD and 74% for BOD5. During the plants growth the total suspension was removed in 88%, whereas during the plants rest efficiency of removing lowered to 69%.
Authors and Affiliations
Anita JAKUBASZEK1, Zofia SADECKA
OPTIMIZATION OF MEASUREMENT POINTS CHOICE IN PREPARATION OF GREEN AREAS ACOUSTIC MAP
The aim of the article is to analyze the selection of measuring points of sustainable sound level in the spa park. A set of points should allow to make on their basis an acoustic climate map for the park at certain times...
THE RISK ASSESSMENT FOR A SINGLE BUILDING ON THE LANDSLIDE AREAS AND FLOODPLAINS
Mass movements and floods are natural hazards posing a threat to the environment and bring significant economic losses. The flooding and landslide are risks in the municipalities of south-eastern Poland. Long-lasting rai...
Determination of reliable concentrations of pollutants in raw wastewater based on different sampling methods
The aim of this study was to check the extent to which the sampling method and the volume of sewage (size of the wastewater treatment plant) influence the determined daily average concentrations of pollution components....
test
test
Peaking factors of dry weather flows in Głogów combined sewage system
This paper presents the results of dry weather flowrate studies in inflow and outflow channels of overflow structure PB-1. The facility is located in P.Skargi Street in Głogów. Based on the results the average daily peak...