The Initial Process of Dam Construction is Seen from a Topographical Perspective (Bench Mark Coordinates and Control Point Coordinates): Case study of D.I. Bajayu Kab Serdang Bedagai

Abstract

The research aims to determine the initial process of dam construction is seen from a topographical perspective ( bench mark coordinate and control point coordinates: case study of D.I. Bajayu kab. Serdang Bedagai. The aim and objective of this topographic survey is to collect topographical data from the field in order to produce supporting data in the form of a topographical/situation base map including cross-sectional and longitudinal cross-sectional images along the measurement location. Measurement 20 data of topographi for BM coordinat and CP coordinat, so: measurements are made up to 50 meters from the left and right bank of the river, measurement lengthwise (long section) of ± 8.2 km was carried out from the confluence of the Padang river with the Bah disappeared river to the Bajayu free intake location, measurement benchmark interval for 100 meters straight area and 50 meters turning area,conduct measurements on the linking route/trace from the planned main building to the free intake of D.I Bajayu and the first building for D.I Paya Lombang, measuring 50 meter intervals, the length of the measurement path from the axle of the weir to the Bajayu free intake is 3,600 m following the embankment to the right of the Padang river, the length of the canal trace from the axle of the weir to the building for the first Paya Lombang is 4,600 m following the existing road.

Authors and Affiliations

Tika Ermita Wulandari, Indri Dayana and Habib Satria

Keywords

Related Articles

Comprehensive Review on Machine Learning Applications in Cloud Computing

Cloud computing provides on-demand access to a variety of processing, storage, and network resources. Over the past few years, cloud computing has become a widely accepted computing paradigm and one of the fastest-growin...

Drowsiness Detection System: Integrating YOLOv5 Object Detection with Arduino Hardware for Real-Time Monitoring

Drowsy driving remains a significant cause of accidents worldwide, prompting the need for effective real-time monitoring systems to detect and prevent driver fatigue. In this paper, we propose a novel approach for drowsi...

Self-Compacting Concrete Using Ggbs with Addition of Steel Fibers on M30 Grade of Concrete

Self-compacting concrete has emerged as a creative invention that is capable of solving the problem and making a remarkable advancement in the field of substantial innovation, which has led to the prior practise of subst...

A Comprehensive Review of Knowledge Distillation- Methods, Applications, and Future Directions

Knowledge distillation is a model compression technique that enhances the performance and efficiency of a smaller model (student model) by transferring knowledge from a larger model (teacher model). This technique utiliz...

Artificial Intelligence in Banking and Finance

Artificial intelligence (AI) has revolutionized the banking and financial industry by improving client relations, precision, and operational efficiency. This paper explores the use of artificial intelligence (AI) in bank...

Download PDF file
  • EP ID EP745551
  • DOI 10.55524/ijircst.2023.11.2.7
  • Views 1
  • Downloads 0

How To Cite

Tika Ermita Wulandari, Indri Dayana and Habib Satria (2023). The Initial Process of Dam Construction is Seen from a Topographical Perspective (Bench Mark Coordinates and Control Point Coordinates): Case study of D.I. Bajayu Kab Serdang Bedagai. International Journal of Innovative Research in Computer Science and Technology, 11(2), -. https://europub.co.uk/articles/-A-745551