The Initial Process of Dam Construction is Seen from a Topographical Perspective (Bench Mark Coordinates and Control Point Coordinates): Case study of D.I. Bajayu Kab Serdang Bedagai

Abstract

The research aims to determine the initial process of dam construction is seen from a topographical perspective ( bench mark coordinate and control point coordinates: case study of D.I. Bajayu kab. Serdang Bedagai. The aim and objective of this topographic survey is to collect topographical data from the field in order to produce supporting data in the form of a topographical/situation base map including cross-sectional and longitudinal cross-sectional images along the measurement location. Measurement 20 data of topographi for BM coordinat and CP coordinat, so: measurements are made up to 50 meters from the left and right bank of the river, measurement lengthwise (long section) of ± 8.2 km was carried out from the confluence of the Padang river with the Bah disappeared river to the Bajayu free intake location, measurement benchmark interval for 100 meters straight area and 50 meters turning area,conduct measurements on the linking route/trace from the planned main building to the free intake of D.I Bajayu and the first building for D.I Paya Lombang, measuring 50 meter intervals, the length of the measurement path from the axle of the weir to the Bajayu free intake is 3,600 m following the embankment to the right of the Padang river, the length of the canal trace from the axle of the weir to the building for the first Paya Lombang is 4,600 m following the existing road.

Authors and Affiliations

Tika Ermita Wulandari, Indri Dayana and Habib Satria

Keywords

Related Articles

Predicting Electricity Usage of Houses Incorporating Smart Meters

The need for smart grid user-side management is becoming more critical as smart power distribution networks evolve. This study suggests a short-term power load forecasting model based on K-means and Clustering to increas...

Robust Data Hiding In Video Using Forbidden Zone and Selective Embedding

In the recent years, there are lots of systems are introduce. The peoples invented a large thing to protect the data and there are lots of hiding techniques are to be invented for security purpose. But that techniques ca...

Exploring the Synergy of Web Usage Data and Content Mining for Personalized Effectiveness

In light of the exponential growth of web data and user volume, individuals are increasingly overwhelmed by information overload on the internet. Addressing this challenge, our study focuses on enhancing web information...

Measure User Satisfaction on Using Malaysia Tourism’s Online Information Service

Increasing numbers of organizations have set up material on their Web sites or portal as a way of providing users with information about their products or services. As a result of development in electronic information re...

Navigating the Evolution: Current Trends and Future Directions in Programming Languages

In the complex realm of software development, the progression of programming languages exemplifies the field's dynamic nature. This review paper embarks on a meticulous journey, delving into historical milestones, dissec...

Download PDF file
  • EP ID EP745551
  • DOI 10.55524/ijircst.2023.11.2.7
  • Views 45
  • Downloads 0

How To Cite

Tika Ermita Wulandari, Indri Dayana and Habib Satria (2023). The Initial Process of Dam Construction is Seen from a Topographical Perspective (Bench Mark Coordinates and Control Point Coordinates): Case study of D.I. Bajayu Kab Serdang Bedagai. International Journal of Innovative Research in Computer Science and Technology, 11(2), -. https://europub.co.uk/articles/-A-745551