The Initial Process of Dam Construction is Seen from a Topographical Perspective (Bench Mark Coordinates and Control Point Coordinates): Case study of D.I. Bajayu Kab Serdang Bedagai

Abstract

The research aims to determine the initial process of dam construction is seen from a topographical perspective ( bench mark coordinate and control point coordinates: case study of D.I. Bajayu kab. Serdang Bedagai. The aim and objective of this topographic survey is to collect topographical data from the field in order to produce supporting data in the form of a topographical/situation base map including cross-sectional and longitudinal cross-sectional images along the measurement location. Measurement 20 data of topographi for BM coordinat and CP coordinat, so: measurements are made up to 50 meters from the left and right bank of the river, measurement lengthwise (long section) of ± 8.2 km was carried out from the confluence of the Padang river with the Bah disappeared river to the Bajayu free intake location, measurement benchmark interval for 100 meters straight area and 50 meters turning area,conduct measurements on the linking route/trace from the planned main building to the free intake of D.I Bajayu and the first building for D.I Paya Lombang, measuring 50 meter intervals, the length of the measurement path from the axle of the weir to the Bajayu free intake is 3,600 m following the embankment to the right of the Padang river, the length of the canal trace from the axle of the weir to the building for the first Paya Lombang is 4,600 m following the existing road.

Authors and Affiliations

Tika Ermita Wulandari, Indri Dayana and Habib Satria

Keywords

Related Articles

Comprehensive View on Defect Analysis and Change Control Process

In this research paper, to improve software quality, defects are identified from different projects. The defects are classified and then analyzed. Those defects are then eliminated by finding the root causes, for which d...

Advancements in AI for Oncology: Developing an Enhanced YOLOv5-based Cancer Cell Detection System

As artificial intelligence (AI) theory becomes more sophisticated and its utilization spreads across daily life, education, and professional settings, the adoption of AI for medical diagnostic and service purposes stands...

The Future of Decision Making: Augmented Intelligence

Artificial intelligence's protracted objective seems to be to teach robots to learn and think like humans. Due to the general tremendous degrees of accuracy as well as fragility in human existence, as well as the open-en...

Comparative Analysis of Energy Cost of Sequential and Parallel Cryptographic Algorithms on Different Platforms

Cell phones, smart cards, and health monitoring gadgets are just a few examples of the numerous battery-powered embedded systems utilized to access, alter, and store sensitive and complicated data today. Users are concer...

Investigating the Wavelength of Light and Its Effects on the Performance of a Solar Photovoltaic Module

In this study, an attempt was made to investigate the wavelengths of light and its effects on the performance of solar photovoltaic module. A case study was conducted to experimentally verify the effect of various colour...

Download PDF file
  • EP ID EP745551
  • DOI 10.55524/ijircst.2023.11.2.7
  • Views 43
  • Downloads 0

How To Cite

Tika Ermita Wulandari, Indri Dayana and Habib Satria (2023). The Initial Process of Dam Construction is Seen from a Topographical Perspective (Bench Mark Coordinates and Control Point Coordinates): Case study of D.I. Bajayu Kab Serdang Bedagai. International Journal of Innovative Research in Computer Science and Technology, 11(2), -. https://europub.co.uk/articles/-A-745551