THE MODEL FOR DETERMINING THE SEQUENCE OF WORKS AND OPERATIONS TO MANAGE THE TIMETABLE OF A CONSTRUCTION PROJECT

Abstract

The subject matter is the issue of managing the content and schedule of a construction project. The goal of the article is to build structural models that determine the sequence and interrelation of works (and operations) of construction projects. The following tasks were solved: a model of the processes of project schedule management was built, a hierarchical structure of a construction project was developed taking into account the operation level, a precedence diagram was constructed for the level of works and operations. The following methods were used: the project approach, process modelling using IDEF0 diagrams, decomposition methods, the method of a precedence diagram.  The following results were obtained: the processes for managing the schedule of a project according to the PMBoK standard were analyzed, their features with were considered with reference to construction projects, as a result, a model of processes for managing construction project schedules presented in IDEF0 notation was built; the level of operations of the hierarchical structure of a construction project was considered; the factors of an enterprise that affect the list of operations were indicated; to compose operations, the decomposition method was used; the WBS-structure of the portfolio of construction projects, including three levels of hierarchy, was supplemented with the fourth level – operations; the examples of some elements of the specified sets of construction project operations were given; the method of precedence diagrams was chosen for determining the sequence of operations; a precedence diagram which indicates inputs and outputs was constructed for the level of the structure operations; a precedence diagram for the level of operations of the project structure was also built in the context of the task of the project documentation development. Conclusions. After establishing the sequence and logical relationship at the level of operations, taking into account the precedence diagram at the level of work, a model of the sequence of a group of operations, groups of work and then the entire project can be built. Taking into consideration the data on the duration of operations, this model will enable assessing the duration of the entire project. This will provide a reliable assessment of resources and the duration of operations. The result will be a project schedule with detailed project content.

Authors and Affiliations

Anna Dorokhina, Alona Starostina, Roman Artiukh

Keywords

Related Articles

RESEARCH OF CLASSIFICATION METHOD OF TV3-117 ENGINE RATINGS OPERATIONS BASED ON NEURAL NETWORK TECHNOLOGIES

The subject matter of the article is ТV3-117 engine ratings and recognition methods. The goal of the work is to create methods for classification TV3-117 engine ratings based on neural network technologies in real time....

LOGISTICS AT AN ENTERPRISE: THE PECULIARITIES OF PROCUREMENT ACTIVITIES

The object of the study is logistic activity at an enterprise. The subject of the study is theoretical conceptions, methods, methodological approaches to the management of logistic activities of the whole enterprise and...

PRINCIPLES AND STRUCTURE OF THE METHODOLOGY OF RISK-ADAPTIVE MANAGEMENT OF PARAMETERS OF INFORMATION AND TELECOMMUNICATION NETWORKS OF CRITICAL APPLICATION SYSTEMS

The subject matter of the article is the processes of structural synthesis and parametric analysis of information and telecommunication networks (ITN). The aim is to develop the methodological apparatus which will enable...

PARAMETRIC SYNTHESIS OF MODELS FOR MULTICRITERIAL ESTIMATION OF TECHNOLOGICAL SYSTEMS

The subject matter of the article is the problem of multicriteria estimation of the properties of technological systems (TS) in the process of their structural-parametric optimization. The goal of the study is to increas...

ANALYSIS AND MODELLING THE PREFERENCES OF SOCIAL NETWORKS USERS

The subject matter of the research is the models and technologies of analyzing the processes of developing the loyalty and preferences of social networks users. The goal of the research is to increase the efficiency of m...

Download PDF file
  • EP ID EP472254
  • DOI 10.30837/2522-9818.2018.6.033
  • Views 59
  • Downloads 0

How To Cite

Anna Dorokhina, Alona Starostina, Roman Artiukh (2018). THE MODEL FOR DETERMINING THE SEQUENCE OF WORKS AND OPERATIONS TO MANAGE THE TIMETABLE OF A CONSTRUCTION PROJECT. Сучасний стан наукових досліджень та технологій в промисловості, 6(4), 33-41. https://europub.co.uk/articles/-A-472254