THE MODEL FOR DETERMINING THE SEQUENCE OF WORKS AND OPERATIONS TO MANAGE THE TIMETABLE OF A CONSTRUCTION PROJECT

Abstract

The subject matter is the issue of managing the content and schedule of a construction project. The goal of the article is to build structural models that determine the sequence and interrelation of works (and operations) of construction projects. The following tasks were solved: a model of the processes of project schedule management was built, a hierarchical structure of a construction project was developed taking into account the operation level, a precedence diagram was constructed for the level of works and operations. The following methods were used: the project approach, process modelling using IDEF0 diagrams, decomposition methods, the method of a precedence diagram.  The following results were obtained: the processes for managing the schedule of a project according to the PMBoK standard were analyzed, their features with were considered with reference to construction projects, as a result, a model of processes for managing construction project schedules presented in IDEF0 notation was built; the level of operations of the hierarchical structure of a construction project was considered; the factors of an enterprise that affect the list of operations were indicated; to compose operations, the decomposition method was used; the WBS-structure of the portfolio of construction projects, including three levels of hierarchy, was supplemented with the fourth level – operations; the examples of some elements of the specified sets of construction project operations were given; the method of precedence diagrams was chosen for determining the sequence of operations; a precedence diagram which indicates inputs and outputs was constructed for the level of the structure operations; a precedence diagram for the level of operations of the project structure was also built in the context of the task of the project documentation development. Conclusions. After establishing the sequence and logical relationship at the level of operations, taking into account the precedence diagram at the level of work, a model of the sequence of a group of operations, groups of work and then the entire project can be built. Taking into consideration the data on the duration of operations, this model will enable assessing the duration of the entire project. This will provide a reliable assessment of resources and the duration of operations. The result will be a project schedule with detailed project content.

Authors and Affiliations

Anna Dorokhina, Alona Starostina, Roman Artiukh

Keywords

Related Articles

IMPROVING THE EFFICIENCY OF HIGH-SPEED MILLING OF THIN-WALLED ELEMENTS OF PARTS OF COMPLEX GEOMETRIC SHAPES

Thin-walled elements of complex geometric shapes are widely used in the aerospace and other industries. They are obtained by various methods of machining using modern numerically controlled machines. The fundamental fact...

MATHEMATICAL МODELLING OF SELECTING INFORMATIVE FEATURES FOR ANALYZING THE LIFE CYCLE PROCESSES OF RADIO-ELECTRONIC MEANS

The subject of the study are methods and models for extracting information about the processes of the life cycle of radio electronic means at the design, production and operation stages. The goal is to develop the fundam...

RISK ASSESSMENT OF INVESTMENTS IN THE ART-INDUSTRY MARKET: SYSTEMATIZATION OF THEORETICAL AND METHODOLOGICAL APPROACHES

The subject matter of the article is theset of theoretical, methodological and practical aspects in assessing investment risks in the art industry market. The goal of the research is the systematization of theoretical an...

THE MODEL OF ASSESSING THE GENERAL INTENSITY OF RESISTANCE TO CHANGES IN AN ORGANIZATION

When analyzing the causes for the failure of previous programmes, the following issues are usually focused on: whether the results of the programmes were timely, whether the budget was not exceeded, and whether the resul...

ASSESSING THE ENERGY COST OF ULTIMATE CONSUMERS OF A LOGISTIC SYSTEM IN THE PROCESS OF MATERIAL FLOW USE

The article deals with the assessment of the energy costs of the end users of the logistics system in the process of using the material flow. The goal of the study is to determine the impact of consumers on the choice of...

Download PDF file
  • EP ID EP472254
  • DOI 10.30837/2522-9818.2018.6.033
  • Views 97
  • Downloads 0

How To Cite

Anna Dorokhina, Alona Starostina, Roman Artiukh (2018). THE MODEL FOR DETERMINING THE SEQUENCE OF WORKS AND OPERATIONS TO MANAGE THE TIMETABLE OF A CONSTRUCTION PROJECT. Сучасний стан наукових досліджень та технологій в промисловості, 6(4), 33-41. https://europub.co.uk/articles/-A-472254