The possible uses of RTN-solutions for markup works on construction

Abstract

The purpose of the research. Elaboration of practical recommendations concerning creation of a geodesic markup construction base with GNSS technologies, including Real Time Networks (RTN) methods. Methodology. To investigate the accuracy of the recommended solutions, different kinds of research were made, including a practical one. It was conducted on the construction site by marking the axis from two base lines, previously indicated by a GNSS receiver in such a way, so they coincided with the x and y axes of the general site’s plan. To minimize the sporadic errors and increase the accuracy of obtained results, the investigation was made on the inherent basis, which allows the forced centering of tools. The special aspect of this basis is that it is situated very close to the permanent station (10 km). This factor substantially compensates the systematic errors in the results of the relative measurements. Results: Results of the study are: it was established that when setting the fixing baseline with the dual-frequency GNSS receiver in the way its pointed coincide with the main axes of construction netting and the following marking of all the elements of the construction site toward this baseline, the required accuracy is provided, e.g. mutual location of points of main, basic, and detailed axes, and in some cases fitting axes as well. Scientific novelty and practical significance. The research presupposes using only the main axes of the construction netting and extend the marking networks of the site and construction. This method allows refusing from building the basic construction netting, by replacing the supporting geodesic network with two base lines (at least 4 fix points), that fix the location of the coordinates’ axes of general site and controlling the axes marking by Total Positioning Station (TPS) method using the value measured by RTN for controlling the value of distances between the base lines points.

Authors and Affiliations

K. Burak, B. Lysko

Keywords

Related Articles

Establishing the environmentally safe width of protective riparian zone along water bodies

Aim. Establishing protective riparian zonesalong the riversides of the Shopurka river inside water protection zones at the territory of urban settlement Velykyy Bytchkiv for protecting surface water bodies from polluting...

Application of artificial neural networks for classifying surface areas with a certain relief

The purpose of research. The main purpose of research is to analyze the relief of various surfaces. For example, to select on the surface the individual sections of a certain form, such as slopes that are oriented in a...

Analysis of modern methods surveying in the processing large-scale plans

Aim. Analysis modern methods surveying of processing large-scale plans. Method. Creating large-scale plans is an important task in mapping Ukraine because the existing topographic plans eventually need to be updated beca...

Calculation of optimal values of measured lenghts for accurate determination of small segments

The paper considers a method of minimizing error when the linear values are determined by measured distances and angles by device that is located not directly ahead of determined intervals. The formula is given for choos...

Monitoring of water vapor content by radio sounding data at the Kyiv aerological station and by GNSS observation data at the GLSV station

The purpose of this paper is determining the water vapor content calculated by the wet component of zenith tropospheric delay (ZTD) obtained by means of radio sounding data and GNSS observations. The investigation method...

Download PDF file
  • EP ID EP483799
  • DOI 10.23939/istcgcap2018.01.016
  • Views 155
  • Downloads 0

How To Cite

K. Burak, B. Lysko (2018). The possible uses of RTN-solutions for markup works on construction. Геодезія, картографія і аерофотознімання, 87(1), 16-20. https://europub.co.uk/articles/-A-483799