The possible uses of RTN-solutions for markup works on construction

Abstract

The purpose of the research. Elaboration of practical recommendations concerning creation of a geodesic markup construction base with GNSS technologies, including Real Time Networks (RTN) methods. Methodology. To investigate the accuracy of the recommended solutions, different kinds of research were made, including a practical one. It was conducted on the construction site by marking the axis from two base lines, previously indicated by a GNSS receiver in such a way, so they coincided with the x and y axes of the general site’s plan. To minimize the sporadic errors and increase the accuracy of obtained results, the investigation was made on the inherent basis, which allows the forced centering of tools. The special aspect of this basis is that it is situated very close to the permanent station (10 km). This factor substantially compensates the systematic errors in the results of the relative measurements. Results: Results of the study are: it was established that when setting the fixing baseline with the dual-frequency GNSS receiver in the way its pointed coincide with the main axes of construction netting and the following marking of all the elements of the construction site toward this baseline, the required accuracy is provided, e.g. mutual location of points of main, basic, and detailed axes, and in some cases fitting axes as well. Scientific novelty and practical significance. The research presupposes using only the main axes of the construction netting and extend the marking networks of the site and construction. This method allows refusing from building the basic construction netting, by replacing the supporting geodesic network with two base lines (at least 4 fix points), that fix the location of the coordinates’ axes of general site and controlling the axes marking by Total Positioning Station (TPS) method using the value measured by RTN for controlling the value of distances between the base lines points.

Authors and Affiliations

K. Burak, B. Lysko

Keywords

Related Articles

Forecast model of vertical displacements of Earth’s surface

Purpose. Safe and reliable exploitation of underground gas storages (UGS) involves monitoring of the vertical displacements of the earth’s surface of gas storage. For the operation of underground storage people construct...

Using inverse filtering to increase the resolution IR images

The aim of the work is to increase the resolution of IR images obtained as a result of monitoring thermal objects. Methodology. It is known, an optical system сan not date a CCD point picture thermal object. Instead pict...

The technique of averaging data for construction of the regional model ionosphere

Purpose. The purpose of this paper is to develop an algorithm of regular averaging time series VTEC to investigate the daily course of ionospheric parameters with the use of empirical methods of analysis. Methodology. In...

Optimizing grid spacing for DEM construction in determining the surface volume of the Antarctic coast island glaciers

Aim. Glaciological, geodetic and photogrammetric methods can be distinguished between methods of obtaining data for observations of glaciers. Photogrammetric method refers to the remote sensing methods, so its applicatio...

Modeling of the regional gravitational field using first and second derivative of spherical functions

Aim. The main task of the geodesy is to determine the shape and size of the Earth and its changes over time. An integral part of determining the shape and size of the Earth is the construction of a geoid surface model, b...

Download PDF file
  • EP ID EP483799
  • DOI 10.23939/istcgcap2018.01.016
  • Views 111
  • Downloads 0

How To Cite

K. Burak, B. Lysko (2018). The possible uses of RTN-solutions for markup works on construction. Геодезія, картографія і аерофотознімання, 87(1), 16-20. https://europub.co.uk/articles/-A-483799