The Rank of Risk Factors Affecting Time Delay and Cost Overrun of Building Constructions Projects in Yangon

Abstract

In Yangon City, Myanmar, most of the building construction projects fail to meet their cost and time constraints, which will lead to low return on investment. The purpose of this paper is to understand risk management of building construction and the study area is Yangon. This study illustrates that how to manage risks in building construction to become a successful project with best possible outcome by reducing risks that delay the project. The study was conducted through a questionnaire survey administered to 39 construction projects and 148 professionals in Yangon for finding risk rating and prioritization of risk. Risk prioritization was done by Technique for Order of Preference by Similarity to Ideal Solution TOPSIS . Khin Su Yi | Kyaw Kyaw "The Rank of Risk Factors Affecting Time Delay and Cost Overrun of Building Constructions Projects in Yangon" Published in International Journal of Trend in Scientific Research and Development (ijtsrd), ISSN: 2456-6470, Volume-4 | Issue-4 , June 2020, URL: https://www.ijtsrd.com/papers/ijtsrd31557.pdf

Authors and Affiliations

Khin Su Yi | Kyaw Kyaw

Keywords

Related Articles

Predictive Analysis of Global Solar Radiation in Awka Using Statistical Error Indicators

Information on the accessibility of solar radiation at a location is an imperative factor in choosing appropriate solar energy system and devices for several applications. Sunshine hours, rainfall, cloud cover, atmospher...

An Efficient Content Collaborative – Based and Hybrid Approach for Movie Recommendation Engine

The purpose of the project is to research about Content and Collaborative based movie recommendation engines. Nowadays recommender systems are used in our day to day life. We try to understand the distinct types of refer...

Modelling and Operation of HVDC Based Power Transmission System

"Submodule overcurrent caused by DC pole-to-pole fault in modular multilevel converter HVDC MMC-HVDC system is one of the important research objects about its electrical characteristics. In this paper, the fault mechanis...

Factors Affecting Digital Marketing in Tourism An Empirical Analysis of the Nepal Tourism Sector

The goal of this analysis is to examine the various factors influencing the adoption of digital marketing E Marketing by the tourism industry in Nepal. The research validates a methodological framework for the applicatio...

Peculiarities of Neuromyographic Indicators in Adolescent Musicians with Pain Syndrome of the Cervicothoracic Spine

The article deals with the clinical manifestations of juvenile spinal osteochondrosis. The main causes of the development of the disease. Pain syndrome, a typical symptom of adult patients, is rare in adolescents. Discom...

Download PDF file
  • EP ID EP686581
  • DOI -
  • Views 120
  • Downloads 0

How To Cite

Khin Su Yi (2020). The Rank of Risk Factors Affecting Time Delay and Cost Overrun of Building Constructions Projects in Yangon. International Journal of Trend in Scientific Research and Development, 4(4), -. https://europub.co.uk/articles/-A-686581