The Rank of Risk Factors Affecting Time Delay and Cost Overrun of Building Constructions Projects in Yangon

Abstract

In Yangon City, Myanmar, most of the building construction projects fail to meet their cost and time constraints, which will lead to low return on investment. The purpose of this paper is to understand risk management of building construction and the study area is Yangon. This study illustrates that how to manage risks in building construction to become a successful project with best possible outcome by reducing risks that delay the project. The study was conducted through a questionnaire survey administered to 39 construction projects and 148 professionals in Yangon for finding risk rating and prioritization of risk. Risk prioritization was done by Technique for Order of Preference by Similarity to Ideal Solution TOPSIS . Khin Su Yi | Kyaw Kyaw "The Rank of Risk Factors Affecting Time Delay and Cost Overrun of Building Constructions Projects in Yangon" Published in International Journal of Trend in Scientific Research and Development (ijtsrd), ISSN: 2456-6470, Volume-4 | Issue-4 , June 2020, URL: https://www.ijtsrd.com/papers/ijtsrd31557.pdf

Authors and Affiliations

Khin Su Yi | Kyaw Kyaw

Keywords

Related Articles

Study of Performance Appraisal System for Faculty Members in Selected Management Institutes Affiliated to Shivaji University Kolhapur

Performance Appraisal provides a periodic review and evaluation of an individual’s job performance. Although the appraisal forms may only be completed once a year, the job of performance appraisal is continuous – som...

A Review on Green Technology Material Processing Through Microwave Energy

To meet the demand of to days of industry, it has become necessary to develop the new processing and manufacturing techniques. These new techniques need to reduce the cost and enhance the properties. These new developed...

Child Labour : A Devastating Evil and Measures Taken by Indian Judiciary

Child labour is not a new issue for India. With the increasing population, the problem and issue of Child labour is also increasing. India is the second largest country after Africa which is adversely affected by child l...

Cassava Retting Water An Alternative Source for Industrial Cellulase Enzyme

Cassava fermentation is one of the teaming businesses in almost all the tribes of Nigeria. Among all the methods of cassava processing to food, fermentation is the most used. This produces foul smelling waste water that...

Effect of Electrical and Non-electrical Parameters on the Performance Measures of Electro-Discharge Machining: A Review

The electrical and non-electrical parameters of EDM influence the performance of EDM. EDM is one of the widely used non-traditional machining process used for machine the hard materials which are difficult to machine by...

Download PDF file
  • EP ID EP686581
  • DOI -
  • Views 127
  • Downloads 0

How To Cite

Khin Su Yi (2020). The Rank of Risk Factors Affecting Time Delay and Cost Overrun of Building Constructions Projects in Yangon. International Journal of Trend in Scientific Research and Development, 4(4), -. https://europub.co.uk/articles/-A-686581