The use of a balanced system of indicators for the management of construction enterprises

Abstract

<p><em>The object of research is a balanced system of indicators (</em>BSI<em>), which is evaluated from the standpoint of its ability to use in the management of construction enterprises, taking into account the current conditions of their functioning in the market. During the research, it is determined that the model of the balanced system of indicators functions only within the limits of the indicated indicators, the choice of which is limited and does not take into account possible changes in the competitive environment. That is why the enterprise, when using the mechanism, should additionally carry out an assessment of possible changes and take into account the subjectivity of a part of the indicators. But for Ukrainian construction companies there is a possibility to take on the experience of foreign countries in introducing </em>BSI<em> and assessing the effectiveness of its use in the practical activities of foreign enterprises. </em><em>BSI</em><em> creates the necessary information basis for decision-making for virtually all functions of enterprise management: forecasting, planning, analysis, control and motivation. The implementation of most of the listed functions requires the availability of appropriate information support.</em></p><p><em>The existing approaches to the definition of models of estimation of the efficiency of activity of construction enterprises are analyzed and the main advantages and disadvantages of existing models are substantiated. For construction companies it is suggested to use in practical terms the concept of the strategy of enterprise development on the basis of a balanced system of indicators by determining the main goals, objectives and principles. Within the framework of this work, the evaluation of the activities of Ukrainian construction companies is based on the assumption that the most problematic are, as a rule, the following business processes: preparation of production; marketing; strategic planning; finances; HR</em><em> </em><em>(</em><em>Human Resources)</em><em>. The expediency of using the methodological approach to the assessment of the effectiveness of management of construction enterprises, in which the matrix of business process distribution is based on the definition of the value of the II (index of importance) and the index of problem (IP), is grounded.</em></p><p><em>The mechanism of stimulation of the company's employees in forming the development strategy based on a balanced system of indicators contributes to the involvement of employees in making decisions in the company's activities, the setting of clear objectives and fair remuneration standards.</em></p>

Authors and Affiliations

Irina Sotnikova

Keywords

Related Articles

Estimated losses of innovative capacity of the parties as a result of «hybrid» Russian aggression against Ukraine

<p><em>The object of the research is the process of estimation of losses of the innovation potential of the states that are in «hybrid» military confrontation. But there appears a problem of trustworthiness of results of...

Study of the tax management problem

<p><em>The subject of research is the field of taxation-related activities. The most topical issues in the field of taxation are highlighted, in particular:</em></p><ul><li><em>tax administration studies;</em></li><li><e...

Development of the multi-project forming method in shipping company's development

<p><em>The object of research is the processes of shipping company’s multi-project content managing. The subject of the study is the method of multi-project management of the development of shipping companies. One of the...

Laboratory studies of the coagulation process of waste waters of milk processing enterprises by changing the mixing rate

<p><em>The object of research is the process of mixing the coagulant with the waste water of the milk processing industry by means of a stirrer at different speeds of rotation. In case of incomplete mixing, there is a lo...

Increasing the accuracy of the non-contact temperature measurement in the case of energy audits of different objects

<p><em>The object of research is the process of thermal inspection of enclosing structures with the help of a thermal imager. One of the most problematic places of thermal imaging energy is the presence of a significant...

Download PDF file
  • EP ID EP527348
  • DOI 10.15587/2312-8372.2018.124543
  • Views 132
  • Downloads 0

How To Cite

Irina Sotnikova (2018). The use of a balanced system of indicators for the management of construction enterprises. Технологический аудит и резервы производства, 1(4), 76-82. https://europub.co.uk/articles/-A-527348