THEORETICAL DEVELOPMENT OF THE ESTIMATE OF DIAMOND WIRE SAVING PLANT

Journal Title: UNKNOWN - Year 1996, Vol 8, Issue 1

Abstract

The article deals with possible estimates which would make the choice of the diamond wire sawing plant easier. Based on the principle law of friction of thin elastic bodies. the estimate procedure intended for the choice of a knew plant, and the estimate procedure for verification of the known plant were established. Orientation and detailed way of estimating the pulling force of the diamond wire sawing plant by the method of passing along the contour is theoretically developed. The advantages and disadvantages of these estimates are discussed, as well as the problems in eslabliishing their basic parameters.

Authors and Affiliations

Siniša Dunda

Keywords

Related Articles

IMPACT OF THE JAKUŠEVEC-PRUDINEC WASTE DISPOSAL SITE ON GROUNDWATER QUALITY

The main goal of the research shown in this paper is to investigate the cause and effect relation of the Jakuševec-Prudinec waste disposal site and the groundwater pollution. The recovery of the JakuševecPrudinec waste...

RUDARSTVO U GOSPODARSTVU REPUBLIKE HRVATSKE

Hrvatska nije posebno bogata mineralnim sirovinama pa se ne može ubrojiti u "rudarske zemlje". Kako je eksploatacija mineralnih sirovina primarna djelatnost u gospodarstvu svake zemlje tako i u nas rudarstvo ipak ima vel...

DEPLETED HYDROCARBON RESERVOIRS AND CO2 INJECTION WELLS –CO2 LEAKAGE ASSESSMENT

Migration risk assessment of the injected CO2 is one of the fi rst and indispensable steps in determining locations for the implementation of projects for carbon dioxide permanent disposal in depleted hydrocarbon reservo...

STUDIJA RASPODJELE U MODELU AKTIVACIJSKE ENERGIJE UPORABOM RAZLIČITIH FUNKCIJA RASPODJELE KOD PROBLEMA IZOTERMALNE PIROLIZE

Glavni cilj rada bio je usporedba rezultata dobivenih uporabom različitih vjerojatnosnih funkcija. Predviđen je model n-toga reda za model raspodjele aktivacijske energije (skr. MRAE), i to primjenom tehnike asimptotske...

Analiza konstrukcijskih i radnih veličina lančane sjekačice

Učinkovit način eksploatacije blokova kamena ostvaruje se kombiniranjem lančane sjekačice i dijamantne žične pile zbog mogućnosti korištenja prednosti jednog ili drugog stroja. Lančane sjekačice se koriste za izradu hori...

Download PDF file
  • EP ID EP29859
  • DOI -
  • Views 187
  • Downloads 4

How To Cite

Siniša Dunda (1996). THEORETICAL DEVELOPMENT OF THE ESTIMATE OF DIAMOND WIRE SAVING PLANT. UNKNOWN, 8(1), -. https://europub.co.uk/articles/-A-29859