Thoughts on Early Involvement in the Operation of Shanghai Newly-Built City Railway
Journal Title: Urban Mass Transit - Year 2025, Vol 28, Issue 5
Abstract
[Objective] By sorting out the construction and operation characteristics of the newly-built city railways in Shanghai and summarizing the existing problems in the early involvement work, suggestions for carrying out the early involvement in operation are put forward so as to improve the efficiency of operation preparation and promote the healthy and sustainable development of city railways in Shanghai. [Method] Firstly, by reviewing the general situation of the planning and construction of the newly-built city railways in Shanghai, it is summarized that the city railways in Shanghai have the characteristics such as construction and operation separation, networked operation, interconnection, etc. Moreover, as the newly-built city railway network is expanding rapidly, time for construction and operation preparation work is tight, resulting in greater pressure on the connection between construction and operation in the line construction process. Therefore, the need for early involvement is urgent. Secondly, the existing problems in the early involvement of the newly-built city railways are analyzed, such as unsmooth coordination in construction and operation preparation, imperfect mechanisms, and incomplete standards. [Result & Conclusion] From the perspectives of the superior competent department, the construction party, and the operation party, relevant countermeasures and suggestions for improving the early involvement work in the newly-built city railways are put forward. It is recommended starting from three aspects, including strengthening the superior management, establishing and improving the early involvement working mode, and enhancing the building of the standard system, to clarify the role positioning of both the construction and operation parties, and improve the working mechanism of superior management. The key work stages should be scientifically divided, and a complete early involvement organizational structure be constructed, and diversified forms of early involvement be adopted. The user demand document for city railways should be compiled, the integrated management of the standard system be strengthened. Communication and cooperation among the three parties should be enhanced, and the working mechanism of early involvement be improved to raise the involvement efficiency.
Authors and Affiliations
Ganfeng XU, Yao TANG, Qinyi YIN, Fei GAO, Rong ZHANG
Influence of Hygrothermal Aging on the Strength of Carbon Fiber Reinforced Compo-site Material Equipment Cabin
[Objective] The operating environment of rail transit trains is relatively complex, and composite materials on the trains are subject to deterioration during operation due to the aging phenomenon caused by harsh extern...
Design of Traction Calculation and Simulation Platform for Urban Rail Transit
[Objective] At the initial stage of urban rail transit projects, it is essential to design a traction calculation simulation platform to accurately evaluate the operational indicators of the signaling system and meet e...
Practice and Reflection on Renovation of Shanghai Urban Rail Transit Existing Lines
[Objective] Shanghai is one of the first batch of cities in China launching urban rail transit systems. In recent years, Shanghai has initiated renovation projects for existing rail lines, undertaking many pioneering exp...
Research on the Application of E-CNY Boarding Code in Urban Rail Transit
[Objective] As in China E-CNY (hereinafter referred to as "digital currency") flourishes in all walks of life, the application scenarios of digital currency in urban rail transit are gradually enriched. Traditionally,...
Structural Strength Analysis of Bogie for Suspended PRT Vehicles
[Objective] Suspended PRT (personal rapid transit) vehicles represent a new type of transportation, with bogie as one of its core components. The structural strength of the bogie directly impacts the operational safety o...