TIMING WITH USING PRO_TIME_ESTIMATION PROGRAM

Journal Title: Research in Logistics & Production - Year 2014, Vol 0, Issue 3

Abstract

This paper presents the issues of standardization of worktime. Presente, the basic methods of standardization of worktime and more detail described timing method. In the next article's parts presented selected possibilities of a computer program Pro_Time_Estimation. Characterized the basic stages and steps to be taken when working with this program. As an example standardization of worktime, selected experimental developments assembly workstation - manual assembly of fuel pump (Fiat 126p). Characterized the construction of this workstation and fuel pump.

Authors and Affiliations

Łukasz Gola, Dorota Warżołek

Keywords

Related Articles

Primary product standardization in spare parts management

Spare parts forecasting and inventory management is a complex process which is often underestimated by the primary product producers. It differs from the production parts management. Although these two processes do not f...

The Application of Ontology in Forecasting the Demand for Spare Parts

The intermittent demand for spare parts of an aircraft engine which results from their random wear and tear during operation makes it difficult to manage logistic supply chains in MRO company. The supply chains indicate...

THE SUPPLY CHAIN IN CLOUD COMPUTING

Firstly, the paper presents the definition and evolution of supply chains. On the other hand, it details the use of mobile solutions in the supply chain and the characteristics, models and forms of cloud computing. Based...

THE CLASSIFICATION OF SCHEDULING PROBLEMS UNDER PRODUCTION UNCERTAINTY

One of the most important issue regarding scheduling problem is production uncertainty. From the standpoint of real-world scheduling problem, it is necessary to find solution of building the schedule which can be insensi...

Production Economics with the Use of Theory of Constraints

The article is a literature review in the scope of theory of constraints in manufacturing companies developed by E. Goldratt. Particular emphasis is placed on the economic sphere of such companies as opposed to the liter...

Download PDF file
  • EP ID EP167584
  • DOI -
  • Views 101
  • Downloads 0

How To Cite

Łukasz Gola, Dorota Warżołek (2014). TIMING WITH USING PRO_TIME_ESTIMATION PROGRAM. Research in Logistics & Production, 0(3), 193-199. https://europub.co.uk/articles/-A-167584