Tracking Predictive Gantt Chart for Proactive Rescheduling in Stochastic Resource Constrained Project Scheduling

Journal Title: Journal of Information and Organizational Sciences - Year 2018, Vol 42, Issue 2

Abstract

Proactive-reactive scheduling is important in the situations where the project collaborators need to coordinate their efforts. The coordination is mostly achieved through the combination of the shared baseline schedule and the deviation penalties. In this paper, we present an extension of predictive Gantt chart to the proactive-reactive scheduling needs. It can be used to track the evolution of the relationship between dynamic and static elements through the time. The dynamic elements are evolving probability distributions due to the uncertainty and revealed information. The static elements are time-agreements in the baseline schedule. We demonstrate that in the stateof-the-art proactive-reactive scheduling, the baseline schedule is agnostic to the information received during the project execution. The sources of such inflexibility in the problem model and the scheduling methods are analyzed. The visualization is highlighted as a precursor to developing new methods that proactively change the baseline schedule in accordance with the gained information.

Authors and Affiliations

Mario Brčić, Danijel Mlinarić

Keywords

Related Articles

Use of Informatics Textbooks in School Classroom

Textbooks are an integral part of school classroom teaching. Their use has been researched for the past few decades with a focus on a wide variety of aspects. This paper is focused on the published literature relative to...

The Scope of the Concept of Information and the Future of Information Science

The key concept of information science is the concept of information which is tied to a number of complications. The main problem is that there is no definition of this concept. The purpose of this article is an analysis...

Discretization for Naive Bayes Taking the Specifics of Heart Data into Account

At the present time heart disease is a major cause of death. Factors such as physical inactiveness, obesity, diabetes, social isolation and aging are expected to make the situation worse. It is worsened even further with...

Tracking Predictive Gantt Chart for Proactive Rescheduling in Stochastic Resource Constrained Project Scheduling

Proactive-reactive scheduling is important in the situations where the project collaborators need to coordinate their efforts. The coordination is mostly achieved through the combination of the shared baseline schedule a...

Differences in Prioritization of the BSC’s Strategic Goals Using AHP and ANP Methods

The development and empirical verification of the balanced scorecard (BSC) model, using the multi-criteria decision-making methods (MCDM) called the analytic hierarchy process (AHP) and the analytic network process (ANP)...

Download PDF file
  • EP ID EP421465
  • DOI 10.31341/jios.42.2.2
  • Views 110
  • Downloads 0

How To Cite

Mario Brčić, Danijel Mlinarić (2018). Tracking Predictive Gantt Chart for Proactive Rescheduling in Stochastic Resource Constrained Project Scheduling. Journal of Information and Organizational Sciences, 42(2), 179-192. https://europub.co.uk/articles/-A-421465