Train Bearing Fault Diagnosis Based on Convolution Temporal-spatial Mutual Fusion Network
Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 10
Abstract
Objective The diverse and complex operating environment of axle box bearings makes it challenging for bearing fault diagnostic methods to achieve satisfactory results with the single sensor. To address this issue, research is conducted on train bearing fault diagnosis based on convolutional temporal-spatial mutual fusion network. Method A multi-sensor fusion approach is adopted, applying the proposed CTS-MFN (a convolutional temporal-spatial mutual fusion network) for bearing fault diagnosis upon horizontal and vertical vibration datasets. The ECA module (efficient channel attention), LSTM (long short-term memory network), and similarity distance constraints are introduced to the convolutional autoencoder, enabling the model to extract temporal-spatial attention features that include inter-modal interaction information. An MLP (multilayer perceptron) is then used to fuse and infer temporal-spatial features from each modality. Result & Conclusion Comparative experiments, ablation studies, and generalization performance analysis demonstrate the effectiveness of the proposed model.
Authors and Affiliations
Jia HE
Prediction for Vibration Response of Railway Vehicle Air-conditioning Structure Based on Constraint Force
Objective The air-conditioning unit, as an essential equipment for passenger comfort regulation in vehicles, generates vibration from the compressor and fan during normal cooling operation. Excessive vibration can lead t...
Simulation Analysis of Factors Influencing Vehicle Passing Performance through Large-slope Metro Turnouts
Objective In the actual metro construction, it is often necessary to lay turnouts on large-slope sections due to planning and construction constraints, land conservation or topographical limitations. However, it is found...
Development and Application of Mechanical Shield Tail Clearance Measurement Device Based on Angle Sensor
Objective In view of the constant changes of shield tail clearance during shield or tunnel boring machine excavation process, to ensure construction safety, it is necessary to measure shield tail clearance in real-time....
Platform Width Calculation Methods for Metro Large Passenger Flow Station Based on Passenger Behavior
Objective According to GB 50157—2013 ′Code for design of metro′, the calculated platform width of metro large passenger flow station is often too narrow to afford the immense passenger flow pressure effectively. Consider...
Interchange Renovation Construction Technology of Beijing Subway Line 10 Xitucheng Station
Objective Taking the interchange renovation construction of Beijing Subway Line 10 Xitucheng Station as example, the construction scheme for interchange renovation in existing station without reserved transfer conditions...