Train In-station Coupling and Decoupling Scheme for Shanghai Metro Line 16
Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 6
Abstract
Objective Shanghai Metro Line 16 adopts a flexible marshalling operation mode, but it takes a long time for the train to complete the coupling and decoupling process, leading to great difficulty in train operation organization. In order to further improve the operation efficiency and simplify the train operation organization, an in-station coupling and decoupling scheme is put forward. Method Based on Shanghai Metro Line 16, the problems that need be solved for train in-station coupling and decoupling are analyzed. In view of the above problems, a concrete implementation scheme for the train in-station coupling and decoupling is put forward. Several tests are carried out on Shanghai Metro Line 16 to verify the effectiveness of the scheme. The main rules about operation safety specified in "Specification on train coupling and decoupling in Longyang Road Station of Shanghai Metro Line 16" are introduced. Result & Conclusion Longyang Road Station, a terminal turnaround station with minimal impact on the line operation, is selected for the coupling and decoupling site. The function of coupling and decoupling operation in the station is realized through modifying the ATS software chain logic and defining a special parking area in the station for coupling and decoupling operation. The test results verify the safety and feasibility of the scheme.
Authors and Affiliations
Yong CUI
Application of Solenoid Valves for Tram Hydraulic Braking Force Control
[Objective] The control solenoid valves in the hydraulic braking system of trams mainly include proportional pressure reducing valve and high-speed switching valve. Due to the structural characteristics, the former is...
Real Time Planning Algorithm of Automatic Train Driving Based on Global Optimization
Objective The existing target speed planning algorithm for the automatic driving of urban rail transit train cannot handle in real time the temporary change of the line speed limit in case of emergency due to the large c...
Deformation Characteristics of Large Section Tunnel Surrounding Rock and Optimization of Tunnel Construction Scheme for Qingdao Metro Line
Objective The large section tunnel, due to flat shape and large span, usually adopts multiple steps and staged excavation. In the process of construction, the surrounding rock and the temporary support are repeatedly dis...
Application of 2.4 GHz Frequency Band Anti-Interference Performance Improvement and Transformation Based on CBTC Vehicle-Ground Wireless Communication System
[Objective] Urban rail transit uses a 2.4 GHz frequency band vehicle-ground wireless communication system for the signal system, which is extremely susceptible to interference from communication operators, civilian WiF...
Adhesion Control Method for EMU
Objective Given the high operating speeds, minimal residual acceleration margin, and open-air track conditions of EMU (electric multiple units), as well as the deficiencies in conventional combination correction methods...