Abstract
A new constructed wetland was built to purify one polluted river in Taiwan, and this study was conducted to evaluate the treatment efficiency of the wetland. Due to the very limitation of available budget, several water quality items, which were stipulated by Taiwan’s Environmental Protection Administration for rivers, in the influent and effluent of wetland were analyzed and evaluated. These items included water temperature, pH, DO, BOD5, TSS, and NH4+-N. The results showed that the average removal rates of total (unfiltered) BOD5, TSS and NH4+-N were 36.9 %, 71.8 % and 47.1%, respectively. With the HRT more than 3.4 days, the wetland could treat the polluted river water effectively. Longer HRT in this wetland appeared no obvious improvement on the removal rate of TSS or NH4+-N. However, BOD removal rate increased while the HRT (Hydraulic Retention Time) increased to about 5 days. In this wetland, the calculated mean first-order reaction rate constant (kT) for BOD5 was 0.15/day with a standard deviation of 0.13/day and for NH4+-N was 0.24/ day with a standard deviation of 0.18/day. It is also concluded that there is a linear proportional relationship between BOD concentrations in the effluent of wetland and its influent mass loading rates, with the coefficient of determination (R2) of 0.6511. Similar result was seen for NH4+-N as well, with the coefficient of determination (R2) of 0.5965. TSS removal rate was found to be linearly proportional to its influent mass loading rate, with the coefficient of determination (R2) of 0.4875.
Authors and Affiliations
D. F. Juang, P. C. Chen
Correlations, partitioning and bioaccumulation of trace metals between different segments of Taylor Creek, southern Nigeria
Correlations between trace metals in dissolved and particulate phases, B. bayad and sediments were investigated in five selected sites along Taylor Creek, which lies between longitude 006°17I to 006°21I E and latitude 05...
An environmental oriented model for optimum cut off grades in open pit mining projects to minimize acid mine drainage
Environmental concerns on mining activities started near the end of the 20th century and is still underway. Due to mining activities, the adverse environmental impact has been significant throughout the history of mankin...
Multicriteria decision analysis in water resources management: the malnichara channel improvement
Multicriteria decision analysis tool is used in many water resources and environmental management projects. The Malnichara is one of the natural channels in Sylhet city (Bangladesh) responsible for storm runoff conveyanc...
Destroying hills in the northeastern part of Bangladesh:<br /> A qualitative assessment of extent of the problem and its probable impac
Indiscriminate cutting of hills in the Sylhet region has become a major environmental issue. The nature and life style of Sylhet intimately related with the hills are thus under the threat of a drastic imbalance in its e...
Development of a thermal desorption method for the analysis of particle associated polycyclic aromatic hydrocarbons in ambient air<br />
An investigation for the analysis of polycyclic aromatic hydrocarbons in airborne particulates using thermal desorption and gas chromatography-mass spectrometry is described. Samples are obtained from ambient air using f...