Upon Scheduling and Controlling Large-Scale Stochastic Network Projects
Journal Title: Journal of Applied Quantitative Methods - Year 2010, Vol 5, Issue 3
Abstract
The problem of controlling large-size stochastic network projects of PERT type is considered. A conclusion is drawn that the need of proper control models for PERT projects is very important. The authors suggest aggregating the initial model in order to modify the latter to an equivalent one, but of medium or small-size. For those network models effective on-line control algorithms are already developed. After observing the project's output at a routine control point and introducing proper control actions the aggregated network is transformed to the initial one, and the project’s realization proceeds. The developed control techniques are especially effective for those R&D projects, when an online control has to be undertaken under a chance constraint. The suggested control model can be regarded as an additional tool to help the project manager to realize the project in time.
Authors and Affiliations
Doron GREENBERG, Dimitri GOLENKO-GINZBURG
TECHNOLOGY ADOPTION, INDUSTRIAL STRUCTURE, AND GROWTH IN EMERGING ECONOMIES
This paper explores the link which is often neglected in the literature between the industrial structure and the aggregate economic growth in emerging economies (EE) that are implementing an openness trade policy. Based...
The Automated System of the Rhythm Analysis in the Educational Process of a Higher Educational Institution on the Basis of Aprioristic Data
In this article we consider the problems of algorithm functioning development for the system of automated analysis of the educational process rhythm in a higher educational institution. Using devices of experimental plan...
COMPARING DISTRIBUTIONS: THE TWO-SAMPLE ANDERSON-DARLING TEST AS AN ALTERNATIVE TO THE KOLMOGOROV-SMIRNOFF TEST
This paper introduces the two-sample Anderson-Darling (AD) test of goodness of fit as a tool for comparing distributions, response time distributions in particular. We discuss the problematic use of pooling response time...
A Cost Model for The It Department
Traditionally, it is believed that a busy IT Department (Information Technology Department) of an organization, with many services offered for other departments is very profitable, or at least “cost-effective”. A real an...
IT Project Metrics
The objectives of IT projects are presented. The quality requirements that these projects must fulfill are established. Quality and evaluation indicators for running IT projects are built and verified. Project quality ch...