Upon Scheduling and Controlling Large-Scale Stochastic Network Projects
Journal Title: Journal of Applied Quantitative Methods - Year 2010, Vol 5, Issue 3
Abstract
The problem of controlling large-size stochastic network projects of PERT type is considered. A conclusion is drawn that the need of proper control models for PERT projects is very important. The authors suggest aggregating the initial model in order to modify the latter to an equivalent one, but of medium or small-size. For those network models effective on-line control algorithms are already developed. After observing the project's output at a routine control point and introducing proper control actions the aggregated network is transformed to the initial one, and the project’s realization proceeds. The developed control techniques are especially effective for those R&D projects, when an online control has to be undertaken under a chance constraint. The suggested control model can be regarded as an additional tool to help the project manager to realize the project in time.
Authors and Affiliations
Doron GREENBERG, Dimitri GOLENKO-GINZBURG
Productivity Assessment and Improvement Measurement of Decision Making Units - An Application for Ranking Cities in Israel
In this paper we will demonstrate how productivity and improvement rate of urban organizational units (called also Decision Making Units - DMU's) may be assessed when measured along several time periods. The assessment a...
An Econometric Approach regarding Anticrisis Measures
It is the purpose of this article to discuss certain econometric elements with a view to perceive the economic crisis signals and especially to reduce recession effects and overcome such a stage of the economic cycle. To...
Statistical Modeling of the Groundwater Arsenic Contamination Level in Bangladesh Due to Chemical Elements
This paper intends to offer a modeling of the magnitude of arsenic, by using 54 variables of chemical elements based on secondary data. The samples are collected from 113 wells from different areas of Bangladesh. The stu...
Improving Resource Leveling in Agile Software Development Projects Through Agent-Based Approach
Successfully project planning, coordinating and controlling in order to deal effectively with projects sponsors, customers, unexpected risks and changing scope are difficult tasks even for the most experienced project ma...
STATISTICAL DETERMINATION OF THE SEQUENCE AND CHRONOLOGY OF THE ERUPTION OF THE FIRST PERMANENT MOLARS AND INCISORS IN ROMANIAN CHILDREN
Teeth eruption is a dynamic, genetically dictated process which is a part of the odontogenesis and comprises all of the tooth’s movement from the bone crypt where it formed until reaching the occlusal plane and starting...