Using a multicriteria interactive approach in scheduling non-critical activities

Journal Title: Operations Research and Decisions - Year 2018, Vol 28, Issue 1

Abstract

A typical project consists of many activities. Logical dependencies cause some of them to be critical and some non-critical. While critical activities have a strict start time, in some projects the problem of selecting the start time of a non-critical activity may arise. Usually, it is possible to use the “as soon as possible” or “as late as possible” rules. Sometimes, however, the result of such a decision depends on external factors, e.g., an exchange rate. In this paper, we consider the multi-criteria problem of determining the start time of a non-critical activity. We assume that the earliest start and the latest start times of the activity have been identified using the critical path method, but the project manager is free to select the time when the activity will actually be started. This decision, however, cannot be changed later, as it is associated with the allocation of key resources. The criteria that are usually considered in such a situation are cost and risk. We assume that the cost depends on an exchange rate. We also consider the risks of project delay and a decrease in quality. This paper formulates the selection of the start time for a non-critical activity as a discrete dynamic multicriteria problem. We solve it using an interactive procedure based on the analysis of trade-offs

Authors and Affiliations

Maciej NOWAK, Krzysztof TARGIEL

Keywords

Related Articles

Further open problems in cooperative games

In 2013, the International Game Theory Review published two special issues on open problems in cooperative games: the first regarding theory and the second applications. In this paper, our aim is to present some problems...

Using a multicriteria interactive approach in scheduling non-critical activities

A typical project consists of many activities. Logical dependencies cause some of them to be critical and some non-critical. While critical activities have a strict start time, in some projects the problem of selecting t...

A control chart using belief information for a gamma distribution

The design of a control chart has been presented using a belief estimator by assuming that the quantitative characteristic of interest follows the gamma distribution. The authors present the structure of the proposed cha...

Review of modelling approaches for healthcare simulation

The goal of this paper is to present a summary of various simulation methods applied to health services and to discuss several internal and external determinants for selecting a particular simulation method to study a gi...

Introducing probabilistic models for redundant system reliability

Probabilistic models have been developed to evaluate the relationship between reliability measures and the performance of a repairable network with built in redundancy. Networks with built in redun-dancy have been consid...

Download PDF file
  • EP ID EP452273
  • DOI 10.5277/ord180103
  • Views 43
  • Downloads 0

How To Cite

Maciej NOWAK, Krzysztof TARGIEL (2018). Using a multicriteria interactive approach in scheduling non-critical activities. Operations Research and Decisions, 28(1), 43-56. https://europub.co.uk/articles/-A-452273