VEHICLES FLOW MANAGEMENT ALONG INNER RING ROAD IN CHENNAI CITY
Journal Title: International Journal of Civil Engineering and Technology - Year 2019, Vol 10, Issue 3
Abstract
25.2 km long inner ring road (IRR) or State highway 2 is a six lane road and it is a major transportation corridor encircling the city of Chennai. It is emerging as a major industrial conurbation having many industrial estates, factories, workshops and Information technology parks. Along IRR from north to south five major intersections is there between Annanagar to Vadapalani. In this study three among five such as intersection near Annanagar, Koyambedu and near Chennai metropolitan development authority colony with a total length of 3.7km are studied. Near Koyambedu has been identified as the deadliest stretch of Chennai. Out of the 1,000 life loss due to road accidents in the city 300 were reported in this 3.7km in the past 18 months. Moreover it struggles with more volume of vehicles than its capacity which leads delay, queuing of vehicles and affect journey time. It needs an immediate attention where transportation system management is suggested to manage the vehicles flow
Authors and Affiliations
SAMPATHKUMAR V and M. M. VIJAYALAKSHMI
AUTOMATION OF DECISION MAKING SUPPORT ON THE DISTRIBUTION OF FINANCIAL RESOURCES ON THE ELIMINATION OF ACCIDENTS ON RAILWAY TRANSPORT
There was proposed a model for automation of the decision support system (DSS), which allows to automate the development of recommendations to the heads of the situational center (SC), which manages all decisions made...
EZTRIGO MNEMONIC DIAGRAM: A COMPARISON STUDY OF STUDENTS’ PERFORMANCE IN PRE AND POST RESULT FOR BASIC DIFFERENTIATION AND INTEGRATION OF TRIGONOMETRIC FUNCTIONS TEST
The objective of this study is to compare the performance of Applied Sciences students’ in a Pre and Post Basic Differentiation and Integration Test during their second year of study at the Faculty of Applied Sciences,...
FACTORS INHIBITING STAKEHOLDER MANAGEMENT OF MEGA CONSTRUCTION PROJECT
The study aims at examining the factors inhibiting stakeholder management of mega construction projects. The study is a case study research where project managers of selected 40 mega construction projects in Lagos, Nig...
ANALYSIS OF EFFICIENCY OF RECOVERING AND RE-INSTALLATION OF LONGWALL EQUIPMENT IN THE CONDITIONS OF THE KUZNETSK COAL BASIN
The main objective of the executed researches was assessment of efficiency of recovering and equipment re-installation of longwalls at the applied technological schemes of mining of flat coal seams of the Kuznetsk coal...
THE CALCULATION OF THE UPPER & LOWER COMPONENTS OF THE NEW RAILWAY ROAD IN DEAD LINES REACTIVATION IN BABAT-JOMBANG AS A CROSS SUPPORT
Railways public transport play important roles in Indonesia in which it becomes one mode of national transportation system with bulk freight characteristics and it contains more advantages compared with other transport...