A Multi-Manned Parallel Two-Sided Assembly Line Balancing with Tool Sharing Approach- A Company Case Study Solved by Exact Solution Approach

Abstract

Purpose- The main aim of this paper is to develop a new mathematical model for the multi-manned parallel two-sided assembly line balancing problem (MPTALBP) generally occur in plants producing large-sized high-volume products such as buses or trucks. Methodology- In this paper, the proposed mathematical model is applied to solve case study of multi-manned parallel two-sided assembly line balancing problem to minimizing the total idle time and reduce the cost associated with tools in mated stations of an assembly line. The proposed mathematical model is solved using a branch and bound algorithm on lingo 17 solvers. Findings- Based on the computational result, it can be seen that less number of workstations are utilized as compared to the theoretical minimum number of workstations with a shared tools approach that reduces space as well as the cost of tools. Practical implications- Since the problem is well known as np-hard problem a company case study problem is solved and the result of the study can be beneficial for the automobile industry to reduce tool cost and overall cost by tools sharing approach. Originality- On the basis of this literature review paper is first to address multi-manned parallel two-sided assembly line balancing problem using the exact solution approach.

Authors and Affiliations

Ashish Yadav, Sunil Agrawal

Keywords

Related Articles

An Optimization of Mechanical Properties of Friction Stir Welded Dissimilar Materials with Different Preheating Conditions

The aim of this work is to optimization of the mechanical properties of friction stir welded dissimilar materials with different preheating temperature. A series of joints were made on 04 mm thick Aluminum7xxx and Mild-...

Mass Optimization for Structural Members in an Aircraft Wing Using Numerical Techniques

In an Aerospace industry, reduction of mass is having a greater significance. In this paper the main objective is to reduce the mass of the structure and without getting effected to system parameters like deflections and...

Analysis of Tube Failure in Economizer and Super Heater Tube in Thermal Power Station

Boiler tube failure continues to be the leading cause for forced outages in fossil fired boiler. The tube failure may be a simple problem, unless it causes damage to the power plant and affects safety of the human being....

Multiresponse Optimization of Process Variables of Powder Mixed Electrical Discharge Machining on Inconel-600 Using Taguchi Methodology

In the present work, performance parameters for the machining of Inconel-600 using Powder Mixed Electrical Discharge Machining (PMEDM) have been optimized using the Taguchi methodology. Experiments have been conducted by...

Defects of Communication Pipes from Plastic in Modern Civil Engineering

Plastic is an important material that is used in civil engineering. Communication pipes - one of the directions of use of plastic. The external environment affects the quality of the use of plastic pipes. Therefore it is...

Download PDF file
  • EP ID EP579811
  • DOI 10.24247/ijmperdapr201905
  • Views 82
  • Downloads 0

How To Cite

Ashish Yadav, Sunil Agrawal (2019). A Multi-Manned Parallel Two-Sided Assembly Line Balancing with Tool Sharing Approach- A Company Case Study Solved by Exact Solution Approach. International Journal of Mechanical and Production Engineering Research and Development (IJMPERD ), 9(2), 51-60. https://europub.co.uk/articles/-A-579811