A Study on Utilization Plans for Already-constructed BIM data for Physical Protection Simulation

Journal Title: International Journal of Engineering and Science Invention - Year 2018, Vol 7, Issue 8

Abstract

Recently, diversified R&D concerning responses to not only natural disasters but also human accidents is being increased. In the case of terror response, quantitative analysis is possible by using a tool allowing physical protection simulation. At this time, construction of geometric modeling for simulation is essential. Therefore, performed was the conversion test to the form of data allowing physical protection simulation by utilization of the already constructed BIM model within the BIM/GIS platform. Through this, construction of more efficient geometric model became possible, and construction of more precise simulation model can be expected based on diversified case studies in the future.

Authors and Affiliations

Seunghwa Park

Keywords

Related Articles

A Review on Concept, Applicability and Implementation of JustIn-Time Technique in Construction Industry

Each venture has a planned service date, which ought to be met fulfilling a budgeted finance. In this situation, the most useful technique is “just-in-time” construction that provides a significant improvement of project...

MDP in Supply Chain: Optimal Inventory Control System

In this article, we study a MDP based inventory control in a two stage Supply Chain. We consider a two stage Supply Chain having Distribution Center (DC) and Retail Vendor (RV) with their respective inventory systems and...

A Real-Time Design Model for Monitoring Electrical Power Transformers from Substations to the Consumers

Widely used in industry for Supervisory Control and Data Acquisition of industrial processes, SCADA systems are now also penetrating the experimental physics laboratories for the controls of ancillary systems such as coo...

Plane Gravitational Waves in Four Dimensional, Space-Time (I)

The plane [(x + y + z) – t] type wave solutions of the field equations Rij = 0 are obtained in the form 𝐿 2 -  4 + 𝛾4 2 2 – L24 + 𝐿1 4 = 0 from Qij + Pij = 0.

Download PDF file
  • EP ID EP397997
  • DOI -
  • Views 78
  • Downloads 0

How To Cite

Seunghwa Park (2018). A Study on Utilization Plans for Already-constructed BIM data for Physical Protection Simulation. International Journal of Engineering and Science Invention, 7(8), 58-62. https://europub.co.uk/articles/-A-397997