A Study on Utilization Plans for Already-constructed BIM data for Physical Protection Simulation
Journal Title: International Journal of Engineering and Science Invention - Year 2018, Vol 7, Issue 8
Abstract
Recently, diversified R&D concerning responses to not only natural disasters but also human accidents is being increased. In the case of terror response, quantitative analysis is possible by using a tool allowing physical protection simulation. At this time, construction of geometric modeling for simulation is essential. Therefore, performed was the conversion test to the form of data allowing physical protection simulation by utilization of the already constructed BIM model within the BIM/GIS platform. Through this, construction of more efficient geometric model became possible, and construction of more precise simulation model can be expected based on diversified case studies in the future.
Authors and Affiliations
Seunghwa Park
A Review on Concept, Applicability and Implementation of JustIn-Time Technique in Construction Industry
Each venture has a planned service date, which ought to be met fulfilling a budgeted finance. In this situation, the most useful technique is “just-in-time” construction that provides a significant improvement of project...
MDP in Supply Chain: Optimal Inventory Control System
In this article, we study a MDP based inventory control in a two stage Supply Chain. We consider a two stage Supply Chain having Distribution Center (DC) and Retail Vendor (RV) with their respective inventory systems and...
A Real-Time Design Model for Monitoring Electrical Power Transformers from Substations to the Consumers
Widely used in industry for Supervisory Control and Data Acquisition of industrial processes, SCADA systems are now also penetrating the experimental physics laboratories for the controls of ancillary systems such as coo...
Plane Gravitational Waves in Four Dimensional, Space-Time (I)
The plane [(x + y + z) – t] type wave solutions of the field equations Rij = 0 are obtained in the form 𝐿 2 - 4 + 𝛾4 2 2 – L24 + 𝐿1 4 = 0 from Qij + Pij = 0.
Dynamiques Urbaines Et Emergence De Nouvelles Centralités Périphériques Dans Les Villes Algériennes. Cas De La Ville D’Ain Beida.
.