Additional components of risk assessment and their impact on the probability parameter
Journal Title: Production Engineering Archives - Year 2017, Vol 0, Issue
Abstract
The article raises the issue of risk assessment and its impact on the quality and safety of work. During the assessment of the turning lathe position additional components associated with the jobs personalization were taken into account. Paragraph 2 item 7 of the Regulation of the Minister of Laborr and Social Policy of 26 September 1997 on general safety regulations defines occupational risk as the likelihood of an adverse event. The authors drew attention to the reality of the accident, which sometimes depends on the predisposition of the employee. It turns out that a correct estimation of the probability of occurrence of the accident to be able to react in a timely way seems extremely important.. This parameter will be assessed more accurately if we take into account a number of additional components resulting from the characteristics of the employee. The results of the personalized assessment of risk may allow appropriate planning of corrective and preventive actions.
Authors and Affiliations
Piotr Saja, Artur Woźny, Andrzej Pacana, Magdalena Dobosz
The process approach to service quality management
In this paper a model of service quality management based on the process approach has been present-ed. The first part of the article contains the theoretical framework of service quality and the process approach in manag...
Quality and fatigue characteristics relation
This paper will explore the mutual correlation of fatigue characteristics ((Kath, σc, ac = f (Rm)) of five structural steels tested at highfrequency loading based on tests (f ≈ 20 kHz, T = 20 ± 10 °C, R = -1). Different...
Assessment of application of 5S practices in ceramic industry
Results of research connected with determining the degree of implementation of 5S practices in ceramics industry are discussed in this paper. Direct survey with employees of companies plus ex-pert interview was used in t...
Context of production engineering in management model of Value Stream Flow according to manufacturing indus-try
The popularity of visual management in the lean concept is caused by the possibility to apply it in solving different kind of issues related to reduce waste or process planning. The adaptations of VSM is focused on strea...
Unbridgeable gap between evolution of blueprint codes and communication – paradigm changing in production
The traditional 2D drawing (hand drawing) in engineering has a commonly known communication code. These communication codes (type of line, width of line or other marks) makes the engineering communication easier, faster...