Analisis Kinerja Simpang Bersinyal Pada Simpang PLN Di Wua-Wua Kota Kendari

Journal Title: Sultra Civil Engineering Journal - Year 2020, Vol 1, Issue 2

Abstract

This study aims to analyze the degree of saturation of the signaled intersection at the intersection of PLN Wua-Wua Kendari, the long queue condition based on the Manual Capacity Road Indonesia (MKJI, 1997) method with direct measurement in the field, traffic delay condition, and predict the performance of PLN intersection Wua- Wua at 5 and 10 years to come. Data analysis techniques use mathematical equations by using Manual Capacity Method of Indonesia (MKJI, 1997) with the help of Microsoft Excel. Traffic volume surveys and queue lengths are carried out together for 15 minutes each time for 12 hours of measurement. The long queuing condition based on MKJI 1997 method on the east approaches 42,62 meters, west approach 79,5 meter, North approach 47,1 meter and Southern approach 52,4 meter with average queue length 55, 4 meters. While based on the calculation directly in the field obtained value on the approach of the East of 33.51 meters, Western approach of 39.23 meters, Northern approach of 41.53 meters, South approach of 58.05 meters, with an average queue length of 43, 08 meters. The traffic delay on the Eastern approach was 56.2 seconds / smp, Western approach of 84.1 seconds / smp, North approach of 64.1 seconds / smp, and Southern approach of 69.0 seconds / smp. Predicted traffic volume for the next 5 years for the Eastern approach of the DS value of 0.94 with the LOS E, the western approach to the DS value of 1.29 with the LOS F, the North approaches the DS value of 1.20 with the LOS F, the Southern approach of the DS value of 1.27 with LOS F, while for the next 10 years on the Eastern approach the value of DS is 1.57 with LOS F, Western approach of DS value of 2.25 with LOS F, North approach of DS value of 2.00 with LOS F, South DS value of 2.12 with LOS F.

Authors and Affiliations

Arsum Rheza Djaya Saputra, Irwan Lakawa, La Ode Musa Rachmat

Keywords

Related Articles

Analisa Angkutan Sedimen Pada Hulu Bendung Aepodu Kabupaten Konawe Selatan

Research on Aepodu Weir Sediment Transport Analysis in South Konawe District, based on observations in the field, Aepodu Weir has a sediment buildup that has now exceeded the height of the weir light house. The purpose o...

Faktor- Faktor Yang Mempengaruhi Proses Pelaksanaan Pekerjaan Jalan Lingkar Kota Kendari II

Project delays can come from service providers or other users who have an impact on additional time and expenses beyond the plan. If the delay comes from the contractor (Contractor), the contractor may be fined, as well...

Sistem Informasi Geografis Kerusakan Jalan Berbasis Web

According to the North Buton Regency Public Works and Spatial Planning Agency in the Central Statistics Agency (2020), in the North Buton Regency area there are still many roads that are slightly damaged or heavily damag...

Evaluasi Kinerja Layanan dan Tingkat Kepuasan Pelanggan Angkutan Penyeberangan Amolengo-Pure Provinsi Sulawesi Tenggara

Indonesia is a large country that is widespread with it’s islands and is a country traversed by the Equator, so sea transportation has an important role to play in connecting one area to another, considering that Indones...

Penggunaan Limbah Nikel Sebagai Material Subtitusi Agregat Kasar Pada Beton K.250

The purpose of this study was to Analyze the characteristics of the aggregates used in concrete mixtures and analyze how much increase in compressive strength of concrete with a variation of nickel slag substitution 0%,...

Download PDF file
  • EP ID EP710742
  • DOI 10.54297/sciej.v1i2.145
  • Views 65
  • Downloads 0

How To Cite

Arsum Rheza Djaya Saputra, Irwan Lakawa, La Ode Musa Rachmat (2020). Analisis Kinerja Simpang Bersinyal Pada Simpang PLN Di Wua-Wua Kota Kendari. Sultra Civil Engineering Journal, 1(2), -. https://europub.co.uk/articles/-A-710742