Faktor- Faktor Yang Mempengaruhi Proses Pelaksanaan Pekerjaan Jalan Lingkar Kota Kendari II

Journal Title: Sultra Civil Engineering Journal - Year 2020, Vol 1, Issue 1

Abstract

Project delays can come from service providers or other users who have an impact on additional time and expenses beyond the plan. If the delay comes from the contractor (Contractor), the contractor may be fined, as well as if the delay arises from the user of the service, the service user shall pay the loss incurred by the service provider, the amount stipulated in the contract in accordance with applicable legislation. Many studies have been done to determine the factors that cause the delay in completion of the project. Budgeted Cost of Work Scheduled (BCWS), describes the budget plan to a certain period of volume of the project plan to be done. Budgeted Cost of Work Performed (BCWP), describes the project plan budget for a certain period of what has been done on the actual volume of work. Land acquisition is the work of Kendari II railway project, at the time of execution of work there is a name of compensation made from the government to the community, if there is a community land whose land is affected by the project. The availability of budget is Kendari II road project, with length 38.15 km with budget amount Rp. 2.607.981.000,00 this is very limited. So that the contractor to carry out the project work according to the existing volume. Geographical conditions of the work of Kendari II city circle project, there are drawings of plans and work items before carrying out a project work. This research concludes that factors influencing the completion of construction project of Kendari II ring road.In accordance with the calculation of SPSS program (factor analysis) of 3 factors that affect the process of execution road construction project in Kendari City. The 3 factors that are contribution value in detail are: 1) availability of budget with value 93,3%, 2) land acquisition with value 68,5% and 3) Geographical condition with value

Authors and Affiliations

La Madu, Sunaryo Sunaryo, Laoede Musa Rachmat

Keywords

Related Articles

Analisis Normalisasi Sungai Baubau

The durability of the road flexural pavement structure is largely determined by the performance of each layer. One of these factors is the strength and resilience of the subbase. Compaction in accordance with applicable...

Korelasi Nilai CBR Dengan kepadatan Lapangan Subbase Course

The durability of the road flexural pavement structure is largely determined by the performance of each layer. One of these factors is the strength and resilience of the subbase. Compaction in accordance with applicable...

Kajian Transportasi Laut pada Era New Normal Di Kabupaten Bombana

This study aims to investigate sea transportation in the new normal era in Bombana Regency, especially at Kasipute Port. This study includes the number of ships operated, the number of passengers departed and arrived at...

Model Hubungan Karakteristik Arus Lalu Lintas Pada Ruas Jalan Abdullah Silondae Kota Kendari

Abdullah Silondae Road is a type of 4 lane 2 undivided road (4/2 UD) which is a pathway to urban activities, education, trade and. The research objective is to model the relationship of traffic characteristic parameters...

Study on the Impact of Climate Change on Damage to National Roads in the Lapuko – South Konawe District/ Kendari City Boundary

The land transportation sector is one sector that is very influential on climate change. One of the impacts faced by the road network due to climate change is damage to roadside sections. This is the basis for the resear...

Download PDF file
  • EP ID EP710735
  • DOI 10.54297/sciej.v1i1.52
  • Views 72
  • Downloads 0

How To Cite

La Madu, Sunaryo Sunaryo, Laoede Musa Rachmat (2020). Faktor- Faktor Yang Mempengaruhi Proses Pelaksanaan Pekerjaan Jalan Lingkar Kota Kendari II. Sultra Civil Engineering Journal, 1(1), -. https://europub.co.uk/articles/-A-710735