Analysis of Construction Worker Group Productivity at Pt. Bima Natisa Graha Contractor for Red Brick Installation Work with Time Study Method on Housing Development Project
Journal Title: International Journal of Social Science Humanity & Management Research - Year 2024, Vol 3, Issue 09
Abstract
This study aims to determine the productivity value of construction workers of PT Bima Natisa Graha red brick installation work on the construction project of housing units in residential area projects, to determine the factors that hinder the productivity of construction workers for red brick installation and to determine the productivity value of construction workers in red brick installation work after improving the factors that hinder the productivity of construction workers in red brick installation. The method to measure the productivity of construction workers in the installation of red bricks with the time study method. Time study is a method of measuring labor productivity in the field by determining the standard time of a job. The results of the study can be concluded as follows: (1) The productivity value of construction workers for red brick installation work on a housing construction project implemented by the contractor PT Bima Natisa Graha on a type 60 housing unit with a time study method of 0.378 M2 / OJ (2) Factors that hinder the productivity of construction workers are site managers, implementers and foremen from PT. Bima Natisa Graha who is rarely seen at the project site which should be in charge of giving directions in carrying out work in the field to workers so that workers joke more, talk a lot, smoke a lot, play a lot of cellphones and have coffee during working hours, this condition occurs because there is no reprimand and direction from the authorities. (3) The productivity value of construction workers for red brick installation work on a housing construction project carried out by the contractor PT Bima Natisa Graha on a type 60 housing unit with the time study method after productivity improvement is 0.496 M2 / OJ.
Authors and Affiliations
Andriansyah
Emotional Bias, Cognitive Bias and Herding Bias toward Investment Decision for Indonesian Investor
In making investment decisions, the role of emotions is very important because of investors irrational symptoms in decision making. This study aims to analyze the effect of emotional bias, cognitive bias, and herding bia...
Course Preference of Senior High School Students in the 1st District of Capiz : Input to Program Reviews among Heis
In the pursuit of the goals of the government that no child shall be left behind to attain higher learnings and that no Grade 12 applicants shall be denied entry in HEIs which offer free tuition and miscellaneous fees al...
Analysis of the Influence of Compensation, Leadership and Work Environment to Employee Job Satisfaction (Studies on Employee Restaurant Fast Serve Mcdonald's in City Banjarmasin)
Study This aim For describe compensation, leadership And work environment on employee job satisfaction at McDonald's restaurants in Banjarmasin City. Examining the influence of compensation, leadership and work environme...
Contingency Leadership Model in a Changing Educational Landscape for an Improved Work Commitment and Performance of Classroom Executives
The study aimed to determine the relationship of between contingency leadership model and teachers work commitment and performance. The study utilized descriptive-correlational design which involved the participation of...
Popular Literature on Post-Divorce Traumatic Experiences
This study explored popular literature on post-divorced traumatic experiences. The study employed a qualitative approach where literature from different studies was analysed thematically. The findings of this desk study...