Analytical Study on Factors Affecting Scheduling of Multiple Projects

Abstract

In this research an attempt has been made to find out the basic practical approach used on Construction site for handling the Multiple Project and also the crucial factors related to Multi Project Scheduling, which were finalized by nonstructured interviews and literature studies. Total 25 main factors were fixed for questionnaire survey and by interviewing various agencies of construction industry like Architects/Management Consultants, Developers and Contractors and from their reviews by using RII and IMPI techniques the analysis was done for Building. After Analysis was done it was Clearly Understood that there was not any Proper Technique and Not any software based approach used to handle the Multiple Project to complete within the Predefined Schedule. After analyzing the 25 factors there are 7 Common Crucial factors for Building Project which are More Frequent to give their impact on Scheduling i.e.: Poor Site Management and Supervision, Ineffective Project Planning and Scheduling, Availability of Local Labour and Raw Materials, Inadequate Contractor Experience, Incompetent Project Team, Co- Ordination, Priority of Project If multiple projects scheduling is done by considering these crucial factors then the possibility of successfully completion of project can be increased.

Authors and Affiliations

Vivekanand Vyas , Pankaj Rao Mahore, Swapneel Vaishnav

Keywords

Related Articles

A Clustering Based Efficient Intrusion Detecting In Multitier Dynamic Web Applications

We present DoubleGuard, a system used to detect attacks in multitiered web services and classify through Hierarchal clustering Algorithm. Our approach can create normality models of isolated user sessions that include b...

Optimized Association Rule Mining with Maximum Constraints using Genetic Algorithm

Association rule mining is to find out association rules that satisfy the predefined minimum support and confidence from a given database.. In this paper initially we applied Apriori algorithm in order to generate frequ...

Energy Efficient Image Compression Using SPIHT and Huffman Encoding Based On DWT over Transmitting OFDM Channel

In this paper we present an energy saving approach to transmission of discrete wavelet transformation based compressed image frames over the OFDM channels. Based on one-bit channel state information at the transmitter,...

Design of Smart Electric Meter Based on IOT

in this growing modern world everything has been under the influence of internet but the process of monitoring electric meter reading is still a manual process which drains most of the human power resulting in less accu...

Text and Sound Data Transfer Through Laser Using Arduino

In today's technology various methods are used for the communication. This paper mainly deals with transmitting serial information and sound file from one place to another via a laser beam. The prototype consist of Ardu...

Download PDF file
  • EP ID EP22521
  • DOI -
  • Views 184
  • Downloads 5

How To Cite

Vivekanand Vyas, Pankaj Rao Mahore, Swapneel Vaishnav (2016). Analytical Study on Factors Affecting Scheduling of Multiple Projects. International Journal for Research in Applied Science and Engineering Technology (IJRASET), 4(8), -. https://europub.co.uk/articles/-A-22521