Analytical Study on Factors Affecting Scheduling of Multiple Projects

Abstract

In this research an attempt has been made to find out the basic practical approach used on Construction site for handling the Multiple Project and also the crucial factors related to Multi Project Scheduling, which were finalized by nonstructured interviews and literature studies. Total 25 main factors were fixed for questionnaire survey and by interviewing various agencies of construction industry like Architects/Management Consultants, Developers and Contractors and from their reviews by using RII and IMPI techniques the analysis was done for Building. After Analysis was done it was Clearly Understood that there was not any Proper Technique and Not any software based approach used to handle the Multiple Project to complete within the Predefined Schedule. After analyzing the 25 factors there are 7 Common Crucial factors for Building Project which are More Frequent to give their impact on Scheduling i.e.: Poor Site Management and Supervision, Ineffective Project Planning and Scheduling, Availability of Local Labour and Raw Materials, Inadequate Contractor Experience, Incompetent Project Team, Co- Ordination, Priority of Project If multiple projects scheduling is done by considering these crucial factors then the possibility of successfully completion of project can be increased.

Authors and Affiliations

Vivekanand Vyas , Pankaj Rao Mahore, Swapneel Vaishnav

Keywords

Related Articles

Design of Tuning Methods for Fractional order PIλDμ Controller using PSO Algorithm

PID controllers are widely used in many industrial applications due to their simplicity and robustness. In conventional PID controllers such as Ziegler’s-Nicholas tuning method it has been found that the controller desi...

CFD Analysis of Vortex Tube for Various Cross Sectional Nozzles

In this article computational fluid dynamic analysis of a 3-D steady state compressible and turbulent flow has been carried out through a vortex tube. The numerical models use the standard realizable k-ε turbulence mode...

Periodic Pattern Surface Defects Detection Using Gabor Filter

surface defects detection is an important aspect of quality control. The surface defects inspection is required on finished products like, leather, textiles, steel rolls etc in order to grade the product and value them....

Advancing Informing Frameworks for Secure Part Based Messaging

Distributed computing has been developing widely, including various clients on the administration it gives. Cloud based email is one of administrations gave by distributed computing number of clients developing yearly p...

Determination of cloud adoption factor and Subordinate Virtual Cloud mechanism to overcome the performance issues in bigdata

Any large unstructured data sets with sizes beyond the ability of the software tools to manage and process within a tolerable elapsed time is rightly observed as bigdata. Cloud computing is delivery of on demand computi...

Download PDF file
  • EP ID EP22521
  • DOI -
  • Views 160
  • Downloads 5

How To Cite

Vivekanand Vyas, Pankaj Rao Mahore, Swapneel Vaishnav (2016). Analytical Study on Factors Affecting Scheduling of Multiple Projects. International Journal for Research in Applied Science and Engineering Technology (IJRASET), 4(8), -. https://europub.co.uk/articles/-A-22521