Assessment of actual power and electric power at construction sites

Journal Title: Architecture and Engineering - Year 2016, Vol 1, Issue 3

Abstract

The article deals with issues connected with power supply of buildings and structures under construction. Due to nonlinear nature of electric power consumption at building industry enterprises, current and feeding voltage are distorted. This causes additional losses of actual power and energy, as well as inaccuracy and ambiguity in readings of power control devices and electric power metering. The article generalizes results of research on harmonic composition of electric power parameters of static converters and states recommendations on improvement of assessment and accounting of actual power and electric energy in electrical networks of building organizations.

Authors and Affiliations

Viktor Reznichenko, Valentin Demidov, Georgii Demidov

Keywords

Related Articles

VARIATIONAL METHOD FOR DERIVATION OF EQUATIONS OF MIXED TYPE FOR SHELLS OF A GENERAL TYPE

In this work, derivation of equations of a mixed type for shallow shell constructions of an arbitrary type is carried out by means of the variational method. Such equations are more simplified equations of the shell theo...

PUBLIC PARTICIPATION IN ENVIRONMENTAL IMPACT ASSESSMENT (EIA): A CRITICAL ANALYSIS

This paper aims at analyzing public participation in Environmental Impact Assessment. It x-rayed the various objectives of public participation in EIA, the prospects and challenges of public participation with a view to...

PREVENTION OF ROUND TIMBER LATERAL CRACKING IN WOODEN HOUSE CONSTRUCTION

The article is devoted to the most widespread defect of regularized round timbers in wooden house construction, i.e. their lateral cracking in the process of further use of buildings and structures. A method is proposed...

REVIT DYNAMO: DESIGNING OBJECTS OF COMPLEX FORMS. TOOLKIT AND PROCESS AUTOMATION FEATURES

Introduction: Design of objects of complex forms (non-linear, round, dynamic in their geometry) currently causes difficulties in the construction of geometry and documentation of various project stages. In this paper, pr...

GRAVITY MIXERS WITH VIBRATION ACTIVATOR IN CONSTRUCTION ENGINEERING

Vibration processes and corresponding machinery and equipment are widely used in construction, production of construction materials and other industries. Compaction, crushing, separation, piling, dosing and transportatio...

Download PDF file
  • EP ID EP355059
  • DOI 10.23968/2500-0055-2016-1-3-24-28
  • Views 72
  • Downloads 0

How To Cite

Viktor Reznichenko, Valentin Demidov, Georgii Demidov (2016). Assessment of actual power and electric power at construction sites. Architecture and Engineering, 1(3), 24-28. https://europub.co.uk/articles/-A-355059