Background of the hybrid power generating nodes based on the renewable energy sources.
Journal Title: Наукові праці Донецького Національного Технічного Університету серія: Електротехніка і Енергетика - Year 2015, Vol 1, Issue 1
Abstract
At the last decades the energy sector of the world experienced a rapid increase in the construction of power plants based on renewable energy sources. Development of these types of power plants and improvement of their design and efficiency are already made them highly competitive with conventional power plants. In this context, the question arises about the possibility of creating a new type of hybrid power generating nodes (PGN), which would combine a diverse range of renewable energy power plants located in the same area and connected to same power line. Such nodes called hybrid because of its output energy, which is a "mixture" of different renewable sources. Creation of PGN should allow to eliminate the disadvantages inherent in each individual type of renewable energy sources and to solve the problems facing the modern power systems. First of all it should increase the reliability and stability of power systems work, reduce transport loss of power, and increase the efficiency of energy market operation. They should also help solve problems arising in 6-10 kV distributing networks. The paper defines the background of such PGN based on renewable energy sources and related scientific problems that require solution. An analysis of the state of the problems performed and conditions of PGN effi cient operation is determined. It is shown that the creation of PGN requires solution of such of problems as determination of the optimal structure of PGN by type of power plants, determination of the installed capacity of the PGN, determination of the placement of PGN in the power system, ensuring the stability of the PGN functioning in the power system, equipping of PGN with effective energy accumulators, determination of the PGN cooperation with another nodes in power system, creation of automatic control system for PGN. The ways of solving the two main problems are proposed. It is shown that the structure of PGN essentially depends on the geographic and climatic factors of the area and on the local electrical load characteristics. It is proposed a method of finding the total installed capacity of PGN with different types of renewable energy power plants. In conclusion, it is shown directions for further researches of the whole complex of problems related to the creation of effective PGN.
Authors and Affiliations
S. F. ARTYKH, K. V. MAKHOTILO
Using the method of exergy analysis to evaluation the efficiency of energy-conversion of glass production plants.
Modern energy technology complexes of glass production, in addition to glass furnace itself, also include systems for utilization of thermal waste energy resources. When equipping the furnace with evaporativ...
Improvement of the converter unit for a combined system of power supply of a local object with a wind gener-ator.
Combined power supply systems for local objects use renewable energy sources and are connected to an alternating current grid. Autonomous wind generators contain an uncontrolled rectifier at the generator output, conve...
Development of generalized equivalent scheme of the morphological level of recognition of transient processes in the distribution smart-grid.
The implementation of modern concepts of network development, namely “Smart Grid”, “Digital Substation”, “Digital Cell”, “Outsourcing Services” implies the transfer and understanding of a large amount of information ab...
Quasioptimal control of synchronous motor with permanent magnets using a strategy of "maximum torque per ampere"
For synchronous motors with built-in permanent magnet rotor was made a comparison control strategy "maximum torque per ampere (MTPA)" and the sample vector control algorithm with maintaining co...
Outsourcing control of work of devices of relay protection and control in power smart-grid. Part 1 Theory.
The problem of workplace organization to perform outsourced control of protection and control devices is considered. The problem of recognition, storage and transmission on the distance of the sense of transient process...