Balancing Time and Cost in Resource-Constrained Project Scheduling Using Meta-Heuristic Approach

Journal Title: Journal of Agricultural Machinery - Year 2024, Vol 14, Issue 2

Abstract

IntroductionAgricultural production involves a series of tasks including tillage, planting, and harvesting, which must be done at the right time for each region and type of product. Failing to complete these tasks on time can lead to a decrease in yield. Farmers may wrongly attribute this to factors such as infertile land, pests, diseases, and uneven rainfall distribution. However, this decrease in yield may not always be evident or tangible. To avoid such losses and unforeseen expenses, it is crucial to plan agricultural mechanization projects using the principles of project control. Agricultural projects, like industrial projects, must be carried out in the correct order and at the right time to achieve optimal results. Given the limited availability of resources for mechanization projects, it is imperative to meticulously plan activities to ensure that they are carried out on time and with maximum utilization of resources. To address these challenges, researchers have used meta-heuristic methods in project control, such as the colonial competition algorithm, which has been proven effective in solving the issue of scheduling projects with limited resources. The algorithm has been tested across various industrial activities and projects, and its performance in scheduling the Resource-Constrained Project Scheduling Problem (RCPSP) has been validated by researchers globally.Materials and MethodsThere is a scheduling issue regarding limited resources in agriculture, and this study presents a novel approach using the imperialist competitive algorithm (ICA). The algorithm not only explores a wider solution space but also strives to minimize deviation from the optimal solution, thereby improving the success rate of the proposed method. This research focuses on two dominant products, wheat and rapeseed, produced in Moghan Agriculture and Industry located in Northwest Iran. To evaluate the effectiveness of ICA, we compared it with other well-known meta-heuristic algorithms. We successfully resolved the problem of project scheduling problem with limited resources by implementing the imperialist competitive algorithm. Our findings have shown that this approach not only significantly increased efficiency but also outperformed other algorithms.Results and DiscussionIn this study, we assessed the efficiency of meta-heuristic methods in solving the RCPSP, which can be useful in optimizing the timeliness of project execution, especially for large-scale projects. Some meta-heuristic methods are only useful for smaller problems, while others can provide near-optimal solutions for larger problems, making them suitable for RCPSP. The algorithm explores a wide range of solutions and avoids premature convergence and getting stuck in local optima, unlike other algorithms such as the genetic algorithm. Optimization reduced the required budget and shortened the duration by 42 days for wheat and 25 days for rapeseed.ConclusionWe utilized the colonial competition algorithm to address the RCPSP problem in agricultural mechanization projects for two agricultural products in Moghan. Our results show that the proposed algorithm converged and reached the optimal solution. The proposed algorithm was compared with other algorithms and it outperformed them.

Authors and Affiliations

A. Taheri hajivand,K. Shirini,S. Samadi Gharehveran,

Keywords

Related Articles

Design, Fabrication and pseudo Field Evaluation of a Sugar Beet Crust Breaker and Weeding Unit Equipped with an Infrared Sensor

In conventional cultivation of sugar beet the weeding and crust breaking are mostly performed manually. The objectives of this research were to design, fabricate and evaluate a soil crust breaker and weeding implement eq...

Synergistic Effect of Atmospheric Pressure Cold Plasma and Hydrogen Peroxide as an Efficient Approach for the Control of Citrus Postharvest Green Mold

IntroductionPenicillium Digitatum (PD) and Penicillium italicum diseases pose significant economic challenges to citrus fruit production across the globe. The primary aim of this research is to investigate the synergisti...

Optimization and Analysis of a λ-Formed Straight Line Linkage for Design of Reversible Disk Plow.

Disk plows are one of the most important tillage tools. Two way (reversible) disk plows can perform continues plowing. So they can save time and costs and hence improve overall efficiency. In this study, a “two-way”...

Effect of Tillage Systems with Corn Residue on Grain Yield of Rapeseed in Moghan Region

This study carried out to evaluate the effect of different tillage systems on rapeseed yield (hayola 401) planted in corn residues. This experiment was done in Moghan region with clay soils during 2009-2012. Different se...

Effect of nanoclay particles on some physical and mechanical properties of soils

Introduction: As a mechanical tillage practices on soil preparation improve soil structure, increase in porosity, better distribution of soil aggregates and eventually modify the physical properties of soil. The use of n...

Download PDF file
  • EP ID EP736135
  • DOI https://doi.org/10.22067/jam.2023.81735.1157
  • Views 84
  • Downloads 0

How To Cite

A. Taheri hajivand, K. Shirini, S. Samadi Gharehveran, (2024). Balancing Time and Cost in Resource-Constrained Project Scheduling Using Meta-Heuristic Approach. Journal of Agricultural Machinery, 14(2), -. https://europub.co.uk/articles/-A-736135