Breakdown of hoisting machine in mining shaft hoist installed in southern section of R-II shaft of KGHM Polska Miedź S.A. O/ZG Rudna
Journal Title: Mining – Informatics, Automation and Electrical Engineering - Year 2018, Vol 536, Issue 4
Abstract
This article applies to a one-of-its-kind case of the cracking of the main shaft of a hoisting machine that occurred in the southern section of the R-II shaft of KGHM Polska Miedź S.A. Oddział ZG “Rudna” in 2011. The mining shaft hoists installed in the R-II shaft are not only the basic extraction equipment in the Rudna mine but also throughout KGHM. The unscheduled standstill cases of these hoists generate huge losses for the mine. These reasons resulted in the necessity for the ad hoc repair of the damaged shaft and operational use of the hoist until a new shaft is completed and delivered. The article describes the works related to the preparation and execution of the repair of the shaft as well as the tests that were performed. The last stage was the preparation of the operational conditions of the shaft of the machine with the repaired shaft with limited kinematic parameters and under strict supervision until the execution of the new shaft.
Authors and Affiliations
Tomasz Rokita
Using GPU acceleration in solving selected kinetic coal gasification models
Coal gasification is recognized as one of clean coal technologies. Though it has been known for a relatively long time, its complexity still challenges scientists all over the world. One of the tools used in the research...
Review of electrostatic hazards in hard coal mining
Electrostatic hazards are considered a category of technical hazards occurring in hard coal mining. These hazards are related to the generation of excess electric charges forming as a result of most technological process...
Telematics in underground mining
Telematics denotes new telecommunication functions connected with the informatics domain. In this paper, these issues have been referred to selected telecommunication and informatics systems applied in Polish mining plan...
Mobile lighting of passenger and material monorails stations
In this article, the authors present the Becker-Warkop company innovative technology development of mobile lighting for passenger and material stations as well as routes during the passage of a suspended monorail. As par...
Back-up short circuit protection in underground medium voltage networks
The paper presents issues related to the implementation of back-up short-circuit protection in the final sections of an underground medium voltage distribution network. The difficulties may arise from regulatory requirem...