BUFFER SIZING METHOD FOR CONSTRUCTING STABLE SCHEDULES OF CONSTRUCTION PROJECTS

Journal Title: Scientific Journal of the Military University of Land Forces - Year 2010, Vol 157, Issue 3

Abstract

The assumption of static and deterministic conditions is common in the practice of construction project planning. However, at the construction phase, projects are subject to uncertainty. This may lead to serious schedule disruptions and, as a consequence, serious revisions of the schedule baseline. The paper focuses on the problem of constructing robust project schedules with a proactive procedure. Robust project scheduling aims at constructing schedules to cope with multiple disruptions during project execution. The method proposed by the authors, based on simulation technique and mathematical programming, was applied to scheduling a sample project. The results were compared, in terms of schedule stability, to those of the float factor heuristic procedure.

Authors and Affiliations

Piotr JAŚKOWSKI, Sławomir BIRUK

Keywords

Related Articles

FORTRESS WROCLAW – UNIQUE HERITAGE OF ARCHITECTURA MILI-TARIS

The aim of the article is to present the unique features of Fortress Wroclaw as the monument of Architectura militaris that is different from other German fortresses, such as Grudziądz, Chełmno, and Malbork, found at pre...

MULTICULTURAL AND MULTIETHNIC ASPECTS OF EXPEDITIONARY OPERATIONS CONDUCTED BY THE POLISH SOLDIERS ABROAD

The article concerns the issue of multicultural and multiethnic aspects of the activity of the Polish soldiers during missions in Afghanistan, Iraq, Chad and Kosovo. The first part shows explanations of the ideas of cult...

STAN PRAWNY I FAKTYCZNY NARODÓW NIEROSYJSKICH W ZSRR W LATACH DWUDZIESTYCH I TRZYDZIESTYCH. WYBRANE PRZYKŁADY

Związek Sowiecki często był nazywany „więzieniem narodów”. W rzeczywistości w żadnym państwie na świecie nie znajdowało się tak dużo mniejszości narodowych i krajów, często z wielowiekowymi tradycjami własnej państwowośc...

ANALYSIS OF MILITARY MOTOR VEHICLES OPERATION PROCESSES

An analysis and assessment of specific problems of military motor vehicles operation have been made, in particular:types of operating methods;→vehicles operation in NATO;→quality, reliability, and structure of vehicles i...

PREPARATION OF RESCUE SERVICES TO PROVIDE AID TO THE INJURED AND PARALYZED BY TOXIC WARFARE AGENTS

Toxic warfare agents (TWAs) can threaten groups of population as a result of terrorist acts as well as industrial failures during which chemical compounds with similar effects to TWAs may be released into the environment...

Download PDF file
  • EP ID EP61036
  • DOI -
  • Views 90
  • Downloads 0

How To Cite

Piotr JAŚKOWSKI, Sławomir BIRUK (2010). BUFFER SIZING METHOD FOR CONSTRUCTING STABLE SCHEDULES OF CONSTRUCTION PROJECTS. Scientific Journal of the Military University of Land Forces, 157(3), 366-377. https://europub.co.uk/articles/-A-61036