Calculation Method for Soil Displacement Caused by Non-horizontal Parallel Double-line Shield Tunnel Construction Based on Modified Loganathan Formula
Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 7
Abstract
Objective To investigate the law of surrounding soil displacement induced by construction under the arrangement of non-horizontal parallel double-line shield tunnels, a soil displacement calculation method based on modified Loganathan formula is proposed. Method The Loganathan formula and its relevant assumptions are introduced. Considering the comprehensive effects of ground loss, soil unloading rebound, and variation of soil loss rate along the excavation path caused by shield tunnel excavation disturbance, the Loganathan formula is modified, and a solution for soil displacement around a single-line shield tunnel is established. Then, a calculation method for soil displacement induced by construction in the case of non-horizontal parallel double-line shield tunnels is developed. The engineering applicability of the proposed method is validated through field monitoring and numerical simulation results of actual projects. Result & Conclusion The proposed calculation method can account for factors such as the angle (θ) between the tunnel axis line and the horizontal plane, the radius (R1,R2) of double-line tunnels, the spacing (D) between tunnel axes, and the buried depth (H1,H2) of double-line tunnels, and the influence of construction factors such as ground loss, soil unloading rebound, and variation of soil loss rate along the excavation path caused by shield tunnel construction disturbance on soil displacement. The average errors between theoretical calculation and field monitoring/numerical simulation results for land subsidence and horizontal soil displacement are 5.6% and 0.6%, and 5.5% and 5.3%, respectively. These errors all meet the 20% accuracy requirement specified by engineering experience, demonstrating that the proposed calculation method can effectively address the soil displacement calculation problem induced by the construction of non-horizontal parallel double-line shield tunnels and has good engineering applicability.
Authors and Affiliations
Chao WANG, Jinfeng ZOU, Fang LI, Bo LIU, Bingbing RAO, Dan SHU
Comprehensive Treatment of Curved Section Abnormal Noise for Elevated Urban Rail Transit Line
[Objective] Problems of vibration and noise during the urban rail transit operation are becoming increasingly prominent. In particular, the wider impact range of elevated line noise has become a hot spot of resident co...
Optimization of Design Parameters of Ground Grouting Waterproof Curtain in Water-Rich Mixed Granite Stratum
Objective Construction of new tunnel in water-rich mixed granite stratum is significantly affected by groundwater, so ground pre-grouting is usually adopted to form a waterproof curtain in order to reduce the effect of g...
Research on Application of Photothermal Imaging Technology in Urban Rail Transit Vehicle Intelligent Operation and Maintenance
[Objective] At present, the lack of monitoring means for the operation status of key components such as axle boxes, gearboxes, and traction motors in the daily operation of urban rail transit trains, makes it impossibl...
Key Technologies of Large-diameter Shield Tunneling in Sand and Gravel Strata
[Objective] Key construction technologies for large-diameter shield tunneling in sand and gravel strata are summarized and analyzed, including shield machine model selection, shield launching and receiving, and shield ex...
Optimization of Mecca Light Rail Train Organization during Peak Hours Based on Virtual Formation Technology
Objective With the annual increase of pilgrim flow in Mecca, the throughput capacity of Makkah Metro Pink Line (simplified as Mecca light rail) operation plan during peak hours is saturated. Therefore, it is aimed to exp...