CALCULATIONS OF THE ECONOMIC EFFICIENCY OF DRILLING WELLS WITH SEPARATE OPERATION OF SEVERAL HORIZONS SIMULTANEOUSLY

Abstract

the article presents a calculation of the economic efficiency of simultaneous development of several layers by one object. The necessary cost indicators of products on the domestic and foreign markets, taxes and payments, as well as expenditure, such as operational, capital costs when using the technology of dual completion (DC) and according to the traditional scheme are described and presented. The DC method is cost-effective and makes it possible to seal the grid of wells (producing and injection) without additional drilling footage and in increasing hydrocarbon production. Dual completion in the world practice of the development of multi-layer deposits is carried out in various ways, which are determined by the design of wells, the nature of separation of layers, types of technological operations of control and regulation of the development of operational facilities. Depending on the operating modes of the layers, the schemes of equipment for dual completion can be represented by the following combinations: fountain-fountain, gaslift-gaslift, pump-pump, injection-injection, fountain-pump, pump-fountain, fountain-gaslift, gaslift-fountain, etc. The effectiveness of dual completion in solving the tasks of the first group is characterized by ensuring optimal working conditions for each formation or the possibility of monitoring and regulating the development of formations. The number of wells in which the DC should be carried out is justified in the project, based on the need to solve these tasks. Evaluation of the effectiveness of the method by the amount of additional oil produced after the transfer of wells to dual completion is carried out only in frequent cases. Basically, with the planned and projected technological scheme of development, the use of the method, additional production should be taken into account when calculating development indicators. When solving the tasks of the first group, the transfer of wells to DC can be carried out both from the very beginning of their commissioning, and after a certain period of joint operation of reservoirs.

Authors and Affiliations

Deryaev Annaguly Rejepovich

Keywords

Related Articles

INTEGRAL ASSESSMENT OF THE COMPETITIVENESS OF UKRAINIAN-MADE CARS (COMPARED WITH THE DIRECT COMPETITORS ON THE AUTOMOBILE MARKET)

The article provides an integral assessment of the competitiveness of Ukrainian-made cars (compared with the direct competitors on the automobile market). An integral assessment of the competitiveness of Ukrainian-made c...

ECONOMIC JUSTIFICATION OF THE NEED TO DRILL WELLS WITH SEPARATE OPERATION OF SEVERAL HORIZONS AT THE SAME TIME

the article provides a complete study of the possibility of simultaneous development of several formations by one object only with the same physical and chemical properties of oil in the combined formations, if the inflo...

Method of comprehensive assessment of the level of economic security of the enterprise

The article researches modern approaches to assessing the level of economic security of an enterprise. Conducting a timely assessment of the level of economic security gives the ability to quickly eliminate various threa...

Green economy in the conditions of modern challenges: conceptual frameworks

Ensuring the sustainable development of economic systems requires the introduction of organizational and managerial and environmentally friendly technologies and innovative business models aimed at reducing the negative...

ОСНОВНІ ТЕНДЕНЦІЇ РОЗВИТКУ ЗРОШЕННЯ: СВІТОВИЙ ДОСВІД ТА УРОКИ ДЛЯ УКРАЇНИ

В роботі автором узагальнено основні тенденції та характерні особливості відродження зрошуваного землеробства як чинника формування продовольчої безпеки у різних країнах світу. Розкрито високу значимість розширення площ...

Download PDF file
  • EP ID EP707916
  • DOI 10.46299/j.isjmef.20220103.10
  • Views 104
  • Downloads 0

How To Cite

Deryaev Annaguly Rejepovich (2022). CALCULATIONS OF THE ECONOMIC EFFICIENCY OF DRILLING WELLS WITH SEPARATE OPERATION OF SEVERAL HORIZONS SIMULTANEOUSLY. International Science Journal of Management, Economics & Finance, 1(3), -. https://europub.co.uk/articles/-A-707916