Comparisons of Standard Time and MOST for Mill and Skive Housing Operation
Journal Title: International Journal of Innovative Research in Computer Science and Technology - Year 2017, Vol 5, Issue 4
Abstract
The purpose of this study was to compare time study and motion study for mill and skive housing operation and to recommend the improvement methodologies for the productivity of the operation. The original time study and the MOST were used to evaluate this operation. The results showed that MOST resulted in 0.372 minutes and the time study resulted in 0.55minutes.
Authors and Affiliations
Sukwon Kim
Effect of Internal Resistance on Electric Current in a Closed Circuit
The research aims to determine the effect of internal resistance on electric current in a closed circuit. The Sample of this study of 20 sample variation.The research method used was the ex post facto method, by not prov...
A Review of Data Mining Techniques and Its Applications
Knowledge Discovery in Databases (KDD) is another name for data mining. It's also known as the process of extracting interpretable, intriguing and valuable statistics from unstructured data. There are a variety of resour...
Privacy-Preserving Services for Social Networks: A Review Paper
The popular and frequently used Online Social Networks (OSNs) all have a conceptually centralized design, in which a single organization holds unprecedented amounts of personal information in terms of amount, variety, ge...
Millimeter Wave generation using MB-OFDM-UWB
In this present technology, scientists have taken the maximum effort of research on UWB signals, which is useful in the field of the sensor networks and wireless data network access. UWB provides high speed data communic...
Methods for Performance Evaluation of the Small Enterprises in Bulgaria
The Evaluation of the work performance of the personnel is one of the key activities in human resources management. In this article the methods of evaluation of performance that are applied in the small enterprises in Bu...