Complexity Theory in Construction Project Time Management

Journal Title: International Research Journal of Applied and Basic Sciences - Year 2013, Vol 6, Issue 5

Abstract

Within the past two decades, management of construction projects is dramatically faced with the uses of different methods and techniques from multiple disciplines. This is mainly due to the rapid changes in project types and contracts, increased level of complicated expectations among stakeholders, and unprecedented factors. As a result, construction projects are increasingly encountering with schedule delays, increased costs and risks, poor quality and increased number of claims and litigations. As such, project managers' main concern is to complete project on time and within budget in such complex and chaotic environment. To this end, they mostly focus on dealing with operational and practical factors influencing complexity rather than analyzing the factors that surround the project environment and have greater impact on understanding the complexity of projects. This research aims at introducing complex environment of construction projects and shed light on better understanding the factors that cause project time management become a complex task. In order to achieve this objective, complex and chaotic environment in project management is investigated from difference perspectives: structural, social, dynamic, and uncertainties. Afterwards, project time management elaborated in PMBOK standard (Project Management Body Of Knowledge) is used to systematically identify inherent parameters of complexity and chaos. Finally, practical suggestions are provided for project managers and schedulers on how to consider and incorporate complexity-based parameters to other feasible factors in their project scheduling and controlling so that better project time management can be achieved. This research contributes significantly to the provision of managerial tools that have the potential benefit of supporting construction projects by better estimating project duration, as a crucial process in project management system. More effective estimation of activities duration by involving factors derived by complex and chaotic project environment can reduce risks and uncertainties and save enormous amounts of cost and time in construction projects.

Authors and Affiliations

Atie Ahmadi| Department of Architecture, Tehran University, Tehran, Iran, at.ahmadi@ut.ac.ir, Mahmoud Golabchi| Department of Architecture, Tehran University, Tehran, Iran, golabchi@ut.ac.ir

Keywords

Related Articles

Investigating the effects of Technology and Education on labor productivity in the agricultural sector in Iran (A Nonlinear Approach)

This research is about detecting and investigating effective factors of Technology and Education on labor productivity in the agricultural sector in Iran. In this regards, many opinions was proposed about Technology and...

Effect of Cadmium Exposure on the Structure of the Cerebellar Vermis of Growing Male Albino Rat

Contamination of the environment with cadmium may impact human health through the persistent exposure to small doses over a long period of time. The present work was planned with the aim to study the histological changes...

Load balancing steam in the steam distribution network at coking plant

In this paper, energy consumption for three steam boilers in the coking plant in Iranis investigated by using operating data. In this theoretical study, first of all math models based on graphs and tables of boilers are...

Applying Information Gap theory mathematical model in optimizing portfolio

Portfolio optimization is a discussion on forming a satisfactory portfolio which sometimes has faced with difficulties as there is an uncertainty in returning investment. Portfolio managers have usually intended to maxim...

EXPLORING DIVERSITY AMONG FARMERS IN ADOPTION OF AGRICULTURAL INNOVATION AND OPTIONS FOR SMALLHOLDER FARMING SYSTEM-A CASE STUDY OF AMBEDKARNAGER DISTRICT OF UP

Smallholder farmers occupy a prominent position in Indian agriculture. Against the background of increasing fragmentation of landholdings, these farmers are facing the challenge of securing their livelihoods within the c...

Download PDF file
  • EP ID EP6163
  • DOI -
  • Views 371
  • Downloads 10

How To Cite

Atie Ahmadi, Mahmoud Golabchi (2013). Complexity Theory in Construction Project Time Management. International Research Journal of Applied and Basic Sciences, 6(5), 538-542. https://europub.co.uk/articles/-A-6163