Constitutive Model and Experimental Study of Stud Steel-Shotcrete Interface Bond-Slip in Mining Method Tunnel Initial Support

Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 8

Abstract

Objective It is aimed to elucidate the constitutive relationship of bond-slip at the interface between stud steel and shotcrete in the initial support of mining method tunnel. Method Four different working conditions are set by varying the length, diameter, and arrangement of the studs. Push-out tests are conducted on steel-shotcrete short columns with studs on web plate, analyzing failure modes, load-slip characteristics and bearing capacity. Result & Conclusion The failure modes of stud specimens are affected by the number and strength of studs, categorized into tensile splitting and bursting failure. The typical average bond strength-relative slip curve can be divided into four stages: no slip, ascending curve, descending curve, and horizontal residual stage. Laboratory tests demonstrate that the diameter and arrangement of the studs are primary factors affecting the bearing capacity. A bond-slip constitutive model for the interface between stud steel and shotcrete is established based on stress mechanism, validated through both laboratory tests and numerical simulations, showing high accuracy. The research results can provide theoretical support for the design of steel and shotcrete support structures of mining method tunnels.

Authors and Affiliations

Zonglin YANG, Shiwen XU, Zhikai LU, Junfu LU, Minrui LI

Keywords

Related Articles

Research Focus at Different Stages of Urban Rail Transit Prophase Works in the New Era

[Objective] In the future, China′s urban development will shift from construction-orientation to governance-orientation. As an important part of the Chinese-style modern social governance system, urban planning is an imp...

Impact Analysis of Connecting Passage Shield Method Construction on Interval Shield Tunnel in High-confined Aquifer Soft Soil Area

Objective During the construction of shield method connecting passage, the jacking and cutting actions cause significant changes in the stress at tunnel intersection, exacerbating the impact of breakthroughs and reducing...

Research on Measurement Method of Wheel-rail Vertical Force of Urban Rail Transit

[Objective] A large number of tunnel diseases usually occur during the operation of urban rail transit, and the main cause of the diseases is the wheel-rail force. Therefore, it is necessary to study the method of measur...

Cause Analysis and Rectification Measures of Chongqing Rail Transit Line 1 Low-frequency Train Oscillation

Objective To address the issue of low-frequency train oscillation on Chongqing Rail Transit Line 1 (hereinafter as ′Line 1′), it is necessary to analyze the causes of the oscillation and formulate appropriate rectificati...

Design of Operation Inspection Garage Clearance Height for Metro Vehicle Bases with Overhead Property Development

Objective The development of overhead property in urban rail transit vehicle bases becomes a basic requirement for vehicle base design in many cities such as Shanghai and Beijing. To effectively address the impact of ove...

Download PDF file